BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Pekin, Illinois. Completed plans call for the renovation of a transportation facility.

Sandblast and Paint Main Hangar and Terminal Building Pekin Municipal Airport The City of Pekin is seeking qualified contractors to submit proposals to sandblast and paint the main hangar and terminal building located at Pekin Municipal Airport. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. A. Sandblast, Prime, and Paint apply approx. 6,500 Square Ft of Minimum hangar wall panels. This is a complete repainting on the main hanger (aside from hangar doors). Color-Sherwin Williams SherCryl white B. Sandblast, Prime and paint the main Terminal building steel surfaces to include the entryway awnings - Color Sherwin Williams Sher-Cryl white C. Paint all associated trim on hangar and terminal. Color-Red to match electrical vault roof. D. Sandblasting of the exterior surface will remove all old paint coatings and rust to ensure a clean surface for new primer and paint. E. During sandblasting the interior of the buildings will be pressurized to minimize dust penetration of the building. F. Miscellaneous electrical items such as cameras, lights and building signage are to be properly taped off and trimmed and shall not have overspray on them. G. All equipment costs shall be included. H. Access to water and electric will be provided, any specialized wiring for equipment to be provided by contractor. Any changes to existing electrical shall be reverted to original condition at completion of project. I. Remove large Pekin airport sign above south door and LEAVE OFF. Any holes uncovered or created in removal of sign shall be patched including screw holes. J. Disposal, dumpster (if necessary) and cleanup must be included. K. Work shall take place during first shift, Monday through Friday weather permitting. NO overtime charges will be accepted. Work can take place on Saturdays to make up for weather. L. Wind an weather shall be taken into consideration when applying paint or sandblasting as to not effect transient aircraft parked on the airport ramp area or cars parked in the parking lot. The manager will coordinate with patrons and tenants to minimize this effect. The airport will attempt to park any ramp aircraft on the west end of the ramp and will issue a NOTAM for transient aircraft that painting and sandblasting will be ongoing. M. The contractor shall provide the city with an estimated project length and start date if awarded a bid. N. Alternate 1 - Include Sandblast, prime, and paint the north and south walls of the T-Hangars O. Alternate 2 - Use city provided dumpsters for sand and debris remova

Award

Transportation Terminals

$55,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
43
Bidding Soon
537
All Active Projects
241
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2023

April 14, 2023

img_map_placeholder

13906 Airport Ln, Pekin, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.