BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of an educational facility in Glenville, West Virginia. Completed plans call for the remodel of a educational facility; and for the renovation of a 2,000-square-foot educational facility.

Last Day for Questions is February 17, 2023, by 5 p.m. and the last addendum, if necessary, will be issued on or about February 20, 2023. 1. Project Location: 300 Pine Street, Glenville, WV 26351 2. Directions: From Interstate I-79 take the Burnsville Exit 79 and head West on WV Rt. 5 to the intersection of Route 119/33 (North Lewis Street). Turn left on on.Route 119/33 and travel one half mile to roundabout. Turn right and take exit towards Mineral Road and immediate left on Center Street. Turn Left onto Walnut Street and travel one half mile to School Road/Pine Street and Gilmer County Middle High School is on the right. A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Renovation of the existing Wood Shop Classroom into an Animal Processing Classroom. B. The Work for this project consists of but is not limited to, general requirements, selective demolition, concrete, masonry, steel doors and frames, hollow metal windows, door hardware, glazing, non-structural metal framing, gypsum wall board, acoustical panel ceilings, resinous flooring and base, painting, canopy covers, food service equipment, mechanical and electrical work as indicated in the contract documents.

Post-Bid

Educational

$1,000,000.00

Public - County

Remodeling, Renovation

12

23

2

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
36
Bidding Soon
384
All Active Projects
148
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2023

April 24, 2023

img_map_placeholder

300 Pine St, Glenville, WV

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.