BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Morton, Illinois. Contact the soliciting agency for additional information.

Job No. MT-98-001-23, Various Phase I/II Projects, Various Routes, Various Counties, Region Five/District Eight. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 26, 2023, at 10:00 AM at the Region Five/District Eight Office in Collinsville. This project includes Phase I and II Geotechnical Engineering Services for various projects, various routes, various counties within Region Five / District Eight. Phase I and/or II engineering services are required for subsurface geotechnical investigations, including but not limited to soil borings, geophysical testing, groundwater studies, pavement cores, rock cores, Roadway Geotechnical Reports (RGRs), Structure Geotechnical Reports (SGRs) and/or other specialized geotechnical analysis and design as needed at various locations in District Eight. All work shall be completed in accordance with the Department's Geotechnical Manual and all Geotechnical Manual Users Memorandums. The Consultant's work is expected to include all management, layout, JULIE notification, drilling and pavement coring, with the potential for laboratory testing and report preparation necessary for RGRs, SGRs, geophysical testing, and other specialized geotechnical analysis The Department will furnish the Consultant with the available plans (may be electronic or paper), historical data, survey benchmarks and estimated coring and/or boring plans necessary to perform the work. The Department will handle all notifications to private property owners and communicate this information to the Consultant prior to starting drilling operations. The field boring logs and field pavement core reports should be returned to the District office with the soil samples and/or pavement samples within one day of drilling operations, if the District is completing the laboratory work. If the Consultant is completing the laboratory work, the handwritten logs should be returned to the District office upon completion of the drilling. The estimated engineering fee for this project is $500,000. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Geotechnical Services (Structure Geotechnical Reports (SGR)) Geotechnical Services (Subsurface Explorations) Geotechnical Services (General Geotechnical Services) Geotechnical Services (Complex Geotech/Major Foundation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 47 - RFQ - Various Phase I/II Projects, Various Routes, Various Counties, Region Four/District Six

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
42
Bidding Soon
575
All Active Projects
257
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2023

img_map_placeholder

Multiple Locations, Morton, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.