BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Naperville, Illinois. Contact the soliciting agency for additional information.

Job No. C-20-002-23, Program Manager CREATE Program (75th Street CIP Project), Various Counties, Bureau of Railroads. This project requires 20% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 25, 2023, at 1:00 PM at the Intermodal Project Implementation (OIPI) Office in Chicago. Phase II and III engineering services are required for long-term maintenance oversight services for the CREATE Program in Illinois. The Program Manager (PM) will manage the CREATE 75th Street Corridor Improvement Project (75th Street CIP) and will report to the current CREATE Program Manager. The estimated engineering fee for this project is $3,000,000. The completion date for this contract will be 36 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Special Services (Construction Inspection) Transportation Studies (Railway Engineering) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 57 - RFQ - Program Manager CREATE Program (75th Street CIP Project), Various Counties, Bureau of Railroads

Conceptual

Sidewalks / Parking Lot

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
120
Bidding Soon
1,809
All Active Projects
819
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2023

img_map_placeholder

75th St, Naperville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.