Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Peachtree City, Georgia. Completed plans call for site work for a water / sewer project.
For CIPP Pipe Lining The City of Peachtree City will be receiving separate sealed Bids for all material, labor and equipment for the "2023 Stormwater Pipe Rehabilitation Project - CIPP Lining Method". This includes the following, with all related accessories as shown on the Construction Drawings and called for in the Contract Documents and Technical Specifications: This project consists of the trenchless rehabilitation (CIPP Lining Method) of 9,244 LF of 15" to 36" diameter corrugated metal stormwater drainage pipe including 138 LF of 22" x 36" elliptical CMP. The selected pipes are located throughout the City. The City desires a fully structural liner at each project location and it will be the Contractors responsibility to determine liner thickness. The City has provided a table indicating the depth of pipe and is included as Attachment C. Groundwater is not known to be an issue at each project location. This contract is locally funded. It is mandatory that all prospective bidders download the Project Manual from the website above. Each Bidder is responsible for checking the website above for any future Addendums and emailing the Purchasing Agent with any questions. Each Bidder must deposit with his bid, security in the amount of 5%, and shall be subject to the conditions provided in Section 00 21 13 "Instruction to Bidders." Each Bidder is required to submit a "Construction Contractors Qualification Statement", "Bid Security", "Bid Form", Non-Collusion Affidavit", and "Security and Immigration Compliance Affidavit" as outlined in Section 00 22 13 "Supplementary Instructions to Bidders." The contract will be awarded to the low, responsive, and responsible bidder with reservation of right to reject all bids. Bids may not be withdrawn by Bidders for 60 days following opening of the bids. The project shall be Substantially Complete within 120 calendar days from the date of Notice to Proceed of the contract. Liquidated Damages shall be assessed in the amount of $200 per day for each calendar day required to achieve Substantial Completion. The project shall be Final Complete within 30 calendar days beyond Substantial Completion. Liquidated Damages shall be assessed in the amount of $200 per day for each calendar day required to achieve Final Completion. There will not be a "Pre-Bid" meeting on N/A located at the City of Peachtree City office. If there is a pre-bid meeting, all contractors submitting a Bid are required to attend. The City of Peachtree City provides assurances to Bidder that all anticipated Federal, State, and Local Permits along with anticipated Rights of Way and Easements have been obtained or will be obtained byN/A. The City of Peachtree City will not accept pre-bid project questions within a period of 120 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and Peachtree City Legal Holidays. The City of Peachtree City will not issue or cause to be issued any addenda modifying the Project Manual within a period of 72 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and Peachtree City Legal Holidays. Agreement will require a Payment Bond in the amount of 110%, and a Performance Bond in the amount of 100% of the project cost. The City of Peachtree City reserves the right to bid a project in phases and award the contract on the phases it deems to be in the City's best interest.
Award
Water / Sewer
$1,082,818.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 23, 2023
April 24, 2023
Multiple Locations, Peachtree City, GA
Related To This Project
Peachtree City, GA
Bid Date: Mar 28 2023
Peachtree City, GA
Bid Date: Mar 07 2023
Peachtree City, GA
Bid Date: Mar 23 2023
Peachtree City, GA
Bid Date: Mar 30 2023
Peachtree City, GA
Bid Date: Apr 07 2023
Peachtree City, GA
Bid Date: May 18 2023
Peachtree City, GA
Bid Date: Jun 01 2023
Peachtree City, GA
Bid Date: May 18 2023
Peachtree City, GA
Bid Date: Mar 23 2023
Peachtree City, GA
Bid Date: Feb 21 2023
Peachtree City, GA
--
Peachtree City, GA
Bid Date: Jan 17 2023
Peachtree City, GA
Bid Date: Feb 06 2023
Peachtree City, GA
Bid Date: Feb 07 2023
Peachtree City, GA
Bid Date: Feb 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.