BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Edina, Minnesota. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; and water / sewer project.

Eden Avevnue and Grange Road Roundabouts Common Excavation (EV) (P) 2,752 C Y Aggregate Base Class 5 (CV) 5,582 Ton Type SP 9.5 Wearing Course Mix (3B) 589 Ton Ornamental Metal Railing Type Special 187 L F Prefabricated Modular Block Retaining Wall 873 S F 12 Storm Sewer Pipe 740 L F 8 Watermain Ductile Iron Cl 52 726 L F Concrete Curb & Gutter Design B618 3,660 L F Lighting Unit Type Special 3 12 Each Underground Wire 1/C 8 AWG 6,425 LF Deciduous Shrub No 5 Cont 181 Each PERMITS AND LICENSES The Contractor shall procure all permits and licenses, pay all charges and fees and give all notices necessary and incidental to the due and lawful prosecution of Work. CONSTRUCTION MEETINGS PRE-CONSTRUCTION MEETING Before work commences on the project, the Engineer will schedule and hold a Preconstruction Meeting. It will be the Contractors duty to invite the Contractors competent superintendent (who shall be familiar with all phases) and the supervisors for any and all subcontractors shall attend this meeting. The Engineer will invite the Public Works Department Utilities Division, Fire and Police Departments, and others deemed necessary will also be invited to attend. A schedule of construction activities shall be discussed at this meeting and shall be agreed upon by all involved. The Contractor shall not hold the City responsible for any added expenses due to alteration of the Contractors proposed schedules to meet the needs of the City or the utilities. If the Engineer deems it necessary, there will also be a preconstruction conference with each subcontractor at least two working days prior to the start of work by the subcontractor. Normally included in the agenda items for the Preconstruction Meeting are the following subjects: Project schedule proposed by Contractor Competent superintendent and competent person designation Traffic control plans of Contractor Shop Drawings Vibration Monitoring Plan Haul routes proposed by Contractor Disposal sites proposed by Contractor Erosion control plans of Contractor Inspection and Testing of materials to be used on the project.

Award

Roads / Highways

$1,858,986.00

Public - City

Outdoor Lighting, Paving, Site Work

11

38

2

9

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
81
Bidding Soon
772
All Active Projects
313
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.