BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a communication facility in Akron, Ohio. Completed plans call for site work for a communication facility.

101-T80-11013 Horizontal boring and installation of fiber optic conduit, cabling and vaults from the Summit County Court of Common Pleas-Juvenile Division located at 650 Dan Street Akron, OH to the Summit Area Regional Council of Governments Public Safety Answering Point (PSAP) located at 630 North Avenue Tallmadge, OH. Fiber optic conduit, cabling and vaults are to be provided to the contractor by the county.The base bid for the project is the installation of 24,246 linear feet (LF) of 2" conduit. This conduit, and additional existing City of Akron conduit, will be used to pull 288- strand Fiber from Dan Street in the City of Akron to the PSAP building in the City of Tallmadge Installation of43 pull boxes For more information please contact Shannon McNulty at shmcnulty@summitoh.net (330) 643- 2557. Questions must be submitted by selecting the Question/Answer section at the top right side of the web page. Questions must be received by March 8, 2023 at 4:00 pm. The County of Summit will not be responsible for oral clarification. Interested vendors are encouraged to submit a bid even if the bid exceeds the engineer s estimate. The county shall consider all responses, examine bids to determine compliance with County ordinances, and shall award the contract to the lowest responsive and responsible bidder. If the winning bid exceeds the engineer's estimate by more the ten percent then the award of the contract will require approval by Summit County Council. The county shall retain the right to reject all bids submitted. Failure to award a contract within sixty (60) days after the bid opening shall constitute rejection of all bids unless an extension is granted by the lowest responsive and responsible bidder with the approval of the Summit County Executive. Â Engineers Estimated Cost Base Bid $1,510,000 Â Engineers Estimated Cost Alternate $441,000

Award

Communication

$1,321,200.00

Public - County

Site Work

44

11

2

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
88
Bidding Soon
991
All Active Projects
374
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2023

April 27, 2023

img_map_placeholder

650 Dan St, Akron, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.