EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 26, 2023 at 7:00 PM

Updated January 26, 2024

Site work and outdoor lighting for a mixed-use development in Alcoa, Tennessee. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

All work shall be performed in strict accordance with the Contract Documents. The work includes but is not limited to the following: The furnishing of all labor, materials, equipment, incidentals, and tools, and miscellaneous services required for the construction and completion of the Project; and submission of material submittals, forms, applications, equipment warranties/registration and other documents, as required by applicable regulatory authorities. SCOPE OF WORK The FAA requires modifications to the four (4) GP-1 towers supporting runway 5L Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR) light bars located at the McGhee Tyson Airport. The MALSR Stations to be modified are 18+00, 20+00, 22+00 and 24+00. The modifications generally include changes to the platform access gate, platform base, and the safety fall protection device. Pre-bid Conference will be held at 10:00 AM local time, Tuesday, March 15, 2022 at the Airport Maintenance Center, 2950 Airfield Service Drive, Building 510, Alcoa, TN. Question Deadline 03/10/2023 at 4:30 PM ET Every request for interpretation or for additional information regarding this RFB shall be made in writing. Submit to Eric Williamson, Director of Design and Construction, via e-mail at eric.williamson@tys.org

Post-Bid

Transportation Terminals

$554,000.00

Public - Federal

Outdoor Lighting, Site Work

9

10

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Closeout Submittals, Bonds, Warranties
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
33
Bidding Soon
537
All Active Projects
230
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2023

April 13, 2023

img_map_placeholder

2055 Alcoa Hwy, Alcoa, TN


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

MALSR Platform Modification Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.