Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 21, 2025 at 8:00 PM
Updated April 22, 2025
Site work, paving and outdoor lighting for a mixed-use development in Forest Park, Illinois. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.
Update:Design and replacement of the Harlem viaduct in partnership with Forest Park and River Forest. The bridge is located at the intersecting border of the three communities with 1/2 of the bridge in Oak Park, 1/4 located in River Forest, and 1/4 located in Forest Park. Funding for the local share of the project (assuming the Village's receive a grant) is based on this same breakdown. Project is included in Village of Oak Park Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.oakpark.com/2024/09/16/state-grant-rekindles-harlem-project/ A $250,000 grant from the Illinois Department of Commerce and Economic Opportunity will allow Forest Park, Oak Park and River Forest to restart dormant efforts to undertake a multi-million-dollar project to replace the railroad bridge at the intersection of?Harlem?Avenue?and South Boulevard that is more than 100 years old. The grant, which was awarded to River Forest, will allow officials from the three municipalities to complete the project’s Phase 1 study, which was started in 2008. The next step is for the three municipalities to approve an updated intergovernmental agreement. Eventually, the three will need agreement on an IGA from other stakeholders – the Union Pacific Railroad, the Chicago Transit Agency, Metra and the Illinois Department of Transportation. “Part of the continued Phase I work will be engaging with those other parties,” Village Administrator Matt Walsh said. “The study will help provide all parties with the necessary information to reach a broader IGA. This will involve Metra and IDOT as well.” Walsh said initial discussions with the CTA and the UP “have been positive.” He also acknowledged that the project “has been out there for some time.” The bridge was originally built in the 1920s to carry the Chicago and Northwestern Railway tracks over?Harlem. It now carries tracks of Metra, the UP and the CTA. The purpose of the reconstruction project is to eliminate the congestion problems caused by the configuration of the existing structure, which has remained essentially unchanged since its construction over 100 years ago despite significant increases in traffic along?Harlem?Avenue. With the DCEO grant secured, River Forest officials voted to approve an agreement with Chicago-based H. W. Lochner Inc., an infrastructure services provider, to complete the Harlem Avenue Viaduct Phase 1 Study for $248,211. The four trustees present at the Sept. 9 village board meeting voted unanimously to enter into the updated IGA and approve the agreement with Lochner. Trustees Bob O’Connell and Respicio Vazquez did not attend. Jack Bielak, director of public works and engineering, told officials that “having a completed Phase 1 opens doors” to funding. “The expected cost will be significant,” Walsh said. In 2023, the cost estimate was $30 million and is likely higher now. He said staff members will look for grant funding at the state and federal level. Bielak explained that Phase I engineering that was started in 2008 needs to be updated, especially the traffic patterns. The bridge structure will be a single-span through-girder bridge supported by drilled-shaft caissons with a minimum clearance of 14 feet, 9 inches, he said in a memo to Walsh. Roadway improvements will require the lowering of Harlem to achieve a vertical clearance along with adjacent roadway improvements, new turn lanes and sidewalk improvements to meet Americans with Disabilities Act standards. In answer to a question from trustee Erika Bachner, Bielak indicated lowering Harlem will not impact water and sewer lines under the street. Additional hurdles that need to be cleared involve the other stakeholders. UP officials indicated they will not move forward with additional reviews needed to reach an IGA unless review fees, which could range from $50,000 to $100,000 are paid, Bielak said. Also, according to standard UP policies, the UP will not approve an IGA or the project unless bridge maintenance and ownership is transferred after the project, meaning IDOT would need to accept ownership. Furthermore, to receive support from the CTA, agency officials indicated they would like to keep their station and yard west of Harlem open during the work and requested that work be done off hours for almost the entire project, he said. In 2008, preliminary engineering of Phase 1 was started to evaluate options for replacement/rehabilitation of the bridge and improvement of traffic flow through the intersection, Bielak said. Initial funding for Phase 1 was provided through a $798,400 Federal High Priority Project grant along with approximately $201,600 in local funds split among the three municipalities with Forest Park and River Forest each paying 25% and Oak Park paying 50%. “I’m very confident of the process,” Village President Cathy Adduci said. “I think the three villages could get something significant. ------ https://www.forestparkreview.com/2024/09/17/state-grant-rekindles-harlem-bridge-project/ A $250,000 grant from the Illinois Department of Commerce and Economic Opportunity will allow Forest Park, Oak Park and River Forest to restart dormant efforts to undertake a multimillion-dollar project to replace the railroad bridge at the intersection of?Harlem?Avenue?and South Boulevard that is more than 100 years old. _____________________________________________________________________________________ https://www.spartnerships.com/pipeline/2024/government-contracting-pipeline-09-04-2024.html Illinois invests $220 million into 10 road and bridge renovation projects The Illinois Department of Transportation (IDOT) is investing nearly $220 million into 10 Cook County road and bridge renovation projects, highlighting a historic construction year for the state. These projects round out the fifth year of the state’s Rebuild Illinois capital plan, a six-year transportation investment program. Since its passage in 2019, Rebuild Illinois has allocated $33.2 billion to renovate, rebuild and repair the state’s aging transportation systems. The program is also the largest capital program in state history and is addressing all forms of transportation needs. _________________________________________ Design and replacement of the Harlem viaduct in partnership with Forest Park and River Forest. The bridge is located at the intersecting border of the three communities with 1/2 of the bridge in Oak Park, 1/4 located in River Forest, and 1/4 located in Forest Park. Funding for the local share of the project (assuming the Village's receive a grant) is based on this same breakdown. The proposed Harlem Avenue Multimodal Bridge Project consists of the replacement of the existing bridge, the lowering of the Harlem roadway to provide for required clearances, and pedestrian and aesthetic enhancements that will transform this deteriorated bridge into a gateway for the three Villages. The new bridge will feature a clear span from viaduct wall to viaduct wall with no columns. The removal of the columns will not only improve the aesthetics but also improve traffic flow on Harlem. Sidewalk, lighting, and decorative treatments will enhance the pedestrian experience under and around the bridge. Vehicle idling in congested areas contributes to greenhouse gas emissions. Improving traffic flow in this area will reduce idling in alignment with Climate Action Goal AQ02 to minimize air pollution. This project is in included in the City's or County's FY 2023-2027 Capital Improvement Plan (CIP). As of February 21, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$3,200,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2028
S Harlem Ave, Forest Park, IL
Related To This Project
Forest Park, IL
Bid Date: Jan 11 2024
Forest Park, IL
Bid Date: Jul 14 2021
Forest Park, IL
--
Forest Park, IL
Bid Date: Mar 13 2024
Forest Park, IL
Bid Date: Mar 28 2024
Forest Park, IL
Bid Date: May 16 2024
Forest Park, IL
--
Forest Park, IL
Bid Date: Jun 07 2021
Forest Park, IL
Bid Date: Mar 25 2022
Forest Park, IL
Bid Date: Jan 19 2022
Forest Park, IL
Bid Date: Sep 14 2023
Forest Park, IL
Bid Date: Sep 14 2023
Forest Park, IL
Bid Date: Feb 01 2022
Forest Park, IL
Bid Date: Jul 26 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
