BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Forest Park, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Forest Park 2023 Village Hall and Community Center Parking Lot Improvements The proposed work is officially known as "2023 Village Hall and Community Center Parking Lot Improvements" and further described as the resurfacing of the parking lots of the Village Hall and the Community Center, surface course and leveling binder, structure adjustments, curb and gutter removal and replacement, sidewalk removal and replacement with ADA improvements, and all necessary restoration, as further described in the contract documents for the said work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL).

Award

Sidewalks / Parking Lot

$74,000.00

Public - City

Paving, Site Work

5

6

2

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
459
Active Projects
251
Bidding Soon
3,358
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2023

October 16, 2023

Project location map

Multiple Locations, Forest Park, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.