BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Oak Park, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project includes the resurfacing of Ridgeland Avenue from Augusta Street to North Avenue, sidewalk corner ramp improvements to meet current ADA requirements using CDBG funds, a bike & ped activated flashing beacon and crossing enhancements at Lemoyne, and traffic signal modernization of the existing older signal at the Division Street intersection. Ridgeland Avenue is an unmarked State highway from Roosevelt Road to Augusta Street. The Village received a grant of $944,000 for construction and $140,000 for construction engineering of Federal Surface Transportation Program (STP) funds for the resurfacing of Ridgeland from Augusta to North Ave. The STP funds will cover 80% of the costs for eligible items with MFT funds being used to fund 10% of the construction costs. Design is locally funded to avoid delays with IDOT. Construction costs are estimated at $1,250,000 ($944,000 fed STP, $118,000 MFT, $118,000 CIP, and $70,000 CDBG) and the State will pay for construction and invoice the Village for the MFT and local share. The Village will pay for construction engineering and be reimbursed by the State for 80% of the costs. This project is in included in the City's or County's FY 2023-2027 Capital Improvement Plan (CIP). As of February 21, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$481,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
253
Bidding Soon
3,376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

Ridgeland Ave, Oak Park, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.