BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Young, Arizona. Contact the soliciting agency for additional information.

Project Name: I-10 Country Club & Kino T.I.s Project (TRACS) Number: 010 PM 263 F0548 01D District: Southcentral (SC) Route/MP: I-10 / 263 Funding Source: F0548 01D Construction Funding FY: 2024 The project is located on I-10 in the City of Tucson, at the T.I.'s of Country Club Rd and Kino Pkwy. The purpose of the design project is to make traffic and safety improvements. This will require additional R/W to be acquired from approximately 35 ADOT parcels. R/W surveys & R/W plans in the project area were done under proj.no.s 010 PM 265 H6373 01R/I-010-E-701, 010 PM 263 H7854 and 010 PM 264 H7458 01R during 2006-2012. The initial scope tasks are anticipated to be for Verification of Right of Way Survey, Supplemental Survey, and Final R/W Plans. Verification of R/W Survey: The selected Consultant will verify an appropriate amount or sampling of the data shown on the Results of Surveys, Supplemental Surveys and Monumentation Surveys for proj.'s 010 PM 265 H6373 01R/I-010-E-701, 010 PM 263 H7854 and 010 PM 264 H7458 within Sec.'s 30, 31, 32 & 33, T14S-R14E and Sec. 4, T15S-R14E in order to confidently prepare an intensive Supplemental Survey drawing for the new project. Limits of the verification will be along I-10 from Approx. MP 262.0 to approx. MP 265.1 (Alvernon Way). Anticipated completion date of the Verification : July 31, 2023. Supplemental Survey: In conjunction with the Verification Survey, the Consultant will also perform field surveying & analysis for additional side street R/W and parcel lines that will be impacted by the new project that was not a part of the aforementioned R/W projects. These include additional areas of Country Club Dr. north and south of I10 and parcels at the SW corner of I-10 and Country Club Dr. The selected Consultant will then combine the results of the verification survey, existing data shown on the the aforementioned surveys & plans and additional survey work described above to prepare a new "extensive" Supplemental Survey drawing for the project replicating all pertinent data. Anticipated due date of the initial review of the Supplemental Survey: October 6, 2023. Final R/W Plans: The selected Consultant will prepare Final R/W plans for the project. Number of anticipated parcels = 30. Anticipated due date of the initial review of the revised Final R/W Plans: December 11, 2023. As the project progresses, it is anticipated that additional scope tasks that may be requested on this project will be Revise Final R/W Plans, Initial R/W Staking and Final R/W Monumentation Survey. Questions, in writing, shall be received by ECS at the below email address until February 21, 2023 at 2:00 P.M. (Arizona Time). No further questions shall be accepted after the time specified. Final Questions Due: February 24, 2023 at 2:00 P.M. (Arizona Time) SOI Submittal Date: February 01, 2023 at 11:00 A.M. (Arizona Time) Estimated Selection Date: March 10, 2023 The method of contractor selection has not been determined at this time. AZ DOT - RFQ - Project Development On-Call - I-10 Country Club and Kino T.I.S

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
19
Bidding Soon
652
All Active Projects
276
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2023

img_map_placeholder

Multiple Locations, Young, AZ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.