BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Young, Arizona. Contact the soliciting agency for additional information.

Project Name: POE Barrier Protection Project (TRACS) Number: F0590 01D District: Northeast, Northcentral, Northwest, Southeast, and Southwest Route/MP: SR 80: I-8, I-10, I-40, and US 89 Funding Source: Federal Construction Funding FY: FY 2024 This project will improve safety at the Page, San Simon, Topock, Sanders, and Yuma Ports of Entry by installing temporary concrete barrier systems with appropriate end treatments to protect the occupied structures and inspection areas. Barrier and pedestrian circulation will be evaluated and barriers installed at the Page Port of Entry on NB and SB US89. Barrier will be evaluated and installed at the San Simon Port of Entry only on WB I-10, barrier at the Topock Port of Entry will be evaluated and installed on WB I-40 and evaluated and installed as necessary on EB I-40. The existing barrier on WB I-40 at the Sanders Port of Entry will be evaluated and replaced or adjusted as required. Barrier will be evaluated and installed at the Yuma Port of Entry only on EB I-8. The consultant is expected to hold progress meetings, as necessary, to ensure the project is on schedule and the team is resolving project issues. The consultant is expected to take proactive measures that mitigate risks and corrective action(s) should slippage of the schedule occur. Document retention, project schedule and risk register, and submittal uploads, and updates in the Workfront platform will be required. All work shall be within the existing right-of-way. Survey efforts are anticipated to be minimal and available data will be made available to the consultant and will include utility designation. A Materials Design Report will NOT be produced. The consultant shall provide documentation and support to ADOT staff in securing the necessary environmental, utility, and Right of Way clearances for the project. Design submittals for each project are expected for Stage III, Stage IV, and PS&E Questions, in writing, shall be received by ECS at the below email address until 3 BUSINESS DAYS BEFORE SOI DUE DATE at 2:00 P.M. (Arizona Time). Final Questions Due: January 19, 2023 at 2:00 P.M. (Arizona Time) SOI Submittal Date: January 24, 2023 at 11:00 A.M.(Arizona Time) Estimated Selection Date: February 6, 2023 The method of contractor selection has not been determined at this time. AZ DOT - RFQ - Project Development On-Call - POE Barrier Protection

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
17
Bidding Soon
652
All Active Projects
267
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2023

img_map_placeholder

Multiple Locations, Young, AZ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.