BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Young, Arizona. Contact the soliciting agency for additional information.

Project Name: Pavement Spot Repairs (Various Locations) Project (TRACS) Number: F0506 / F0507 / F0508 / F0509 / F0510 / F0517 / F0518 District: Varies (see below) Route/MP: Varies (see below) Funding Source: Minor & Preventative Pavement Preservation Construction Funding FY: Varies (see below) These seven (7) projects are distributed throughout Arizona and have been prioritized by the Pavement Management Section to receive 2 inch pavement spot repairs to rehabilitate substandard conditions. Each project will include a scoping phase to establish costs of implementing pavement spot repairs and associated ADA and guardrail improvements. For projects selected to continue into final design, the Consultant shall provide construction documents for spot repairs and, as needed, 1) address ADA non-compliance features, 2) address deficient guardrail, 3) complete AASHTO design exceptions, and 4) complete an AASHTO analysis for features requesting a design exception. The original contract modification will be executed for the scoping of the four (4) projects programmed for FY22 design. A second contract modification will be executed for the scoping of the three (3) projects programmed for FY23 design. Scoping construction cost estimates will be used to determine which of seven (7) projects will be carried into final design. A final contract modification will be executed for the final design of selected projects. A tentative sequencing of the potential contract modifications for scoping and final design is shown below: Task 1: Scoping - F0506, F0510, F0517, F0518 (FY22 Design) Task 2: Scoping - F0507, F0508, & F0509 (FY23 Design) Task 3: Final Design - F0506, F0510, F0517, & F0518 (FY22 Design) and F0507, F0508, & F0509 (FY23 Design) Final Questions Due: May 11, 2022 at 2:00 P.M. (Arizona Time) SOI Submittal Date: May 16, 2022 at 11:00 A.M. (Arizona Time) Estimated Selection Date: May 26, 2022 There will be no Pre-Submittal Meeting associated with this solicitation. As the project progresses, it is anticipated that an additional scope task that may be requested on this project will be Monument Existing Right of Way Questions, in Writing, Shall Be Received by Ecs at the Below Email Address Until 3 Business Days Before Soi Due Date at 2:00 P.m. (Arizona Time). No Further Questions Shall Be Accepted After the Time Specified. The method of contractor selection has not been determined at this time. AZ DOT - RFQ - Project Development On-Call - Pavement Spot Repairs

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
20
Bidding Soon
555
All Active Projects
162
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

img_map_placeholder

Multiple Locations, Young, AZ

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.