BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a road / highway in San Antonio, Texas. Completed plans call for site work for a road / highway.

Companies wishing to respond to this solicitation must download the Collective Document from this website. The Collective Document contains important information regarding responses to this bid opportunity. CPS Energy is seeking Company to perform underground turnkey projects including but not limited to the design and installation of underground infrastructure facilities. The scope of work includes electric design work, and electric construction work. Ask questions by 3/1/2023 2:00 pm US/Central All questions regarding this procurement must be submitted in writing, either through this portal, or to the Procurement Agent via email at tdow@cpsenergy.com. The Scope of Work includes directional boring, excavation and installation of ductlines, streetlight foundations, manholes, vaults, concrete slabs and associated materials, as required; and coordinating the location of existing and proposed telephone cables, TV cables, gas lines, water lines, electric lines, sewer lines, traffic-signal cables and drainage facilities through their respective companies. Responsibilities include the receiving, transporting and unloading of all materials from a designated CPS Energy service center. Contractor shall provide all trenching, backfilling of ditches, excavation, concrete/flowable fill encasement of conduits, repair of damage to any street, road or highway, clean-up of rights-of-way disposal of asphalt/spoils and performing any other functions identified in this specification. CPS Energy will provide Civic Improvement Plans, when available, which include "plan and profile" drawings for existing and proposed utilities. It is the Contractor's responsibility to review the plans and make the necessary adjustments to the CPS Energy electric infrastructure so as to avoid conflicts with the proposed utilities. The Contractor shall notify the CPS Energy Field Representative in charge of the Project if any adjustments to the CPS Energy electric infrastructure are necessary

Post-Bid

Roads / Highways

$155,417.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

92 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
120
Bidding Soon
2,227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

June 1, 2023

Project location map

To Be Determined, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.