Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Ada, Oklahoma. Completed plans call for site work for a water / sewer project.
A bid bond in the amount of 5% of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will, within ten (10) days of the date of notice of award, enter into contract and file the required bonds. No bidder may withdraw his bid within 45 days after the actual date of the opening thereof. The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner. Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the office designated in the solicitation by the time specified in herein. Any proposal, modification, or revision received at the office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered. WATER SYSTEM IMPROVEMENTS WATER MAIN EXTENSION ALONG CR 3570 FROM CR 1590 TO CR 1580 SEC, 22 & 23, T-3-N, R-6-E, I.M 4" and 6" Mains in the Vicinity of CR3570 and CR1590 - MEC 219022 4" Main Along CR 1500 - MEC 222041 4" Main Along CR1590 to SH 99 - MEC 222098 Section A - MECE No. 219022 Water Main Extension Along CR 3570 From CR 1590 to CR 1580 6,280.00 LF 6" PVC CL 200 Waterline 1,166.00 LF 4" PVC CL 200 Waterline 360.00 LF Directional Bore & Install 6" PE SDR 11 Waterline 4.00 Ea. PVC to PE Transition 1.00 L.S. Master Meter Vault Section B - MECE No. 222098 Water Main Along CR 1590 From CR 3570 to State Highway 99 4,900.00 LF 4" PVC CL200 Waterline 400.00 LF Directional Bore & Install 4" PE SDR 11 Waterline 50.00 LF Bore & Install 8" Steel Casing 0.188" Thk. 2.00 Ea. PVC to PE Transition Section C - MECE No. 222041 Water Main Along CR 1500 3,760.00 LF 4" PVC CL200 Waterline 100.00 LF Directional Bore & Install 4" PE SDR 11 Waterline 2.00 Ea. PVC to PE Transition 3.00 Ea. 4" Gate Valve
Award
Water / Sewer
$168,902.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2023
April 13, 2023
Multiple Locations, Ada, OK
Related To This Project
Ada, OK
Bid Date: Mar 27 2023
Ada, OK
Bid Date: Apr 05 2023
Ada, OK
Bid Date: Mar 30 2023
Ada, OK
--
Ada, OK
Bid Date: Apr 13 2023
Ada, OK
Bid Date: Apr 20 2023
Ada, OK
Bid Date: Apr 20 2023
Ada, OK
Bid Date: Apr 13 2023
Ada, OK
Bid Date: Mar 03 2023
Ada, OK
Bid Date: Mar 09 2023
Ada, OK
Bid Date: Mar 08 2023
Ada, OK
Bid Date: Apr 22 2021
Ada, OK
Bid Date: Jan 30 2023
Ada, OK
Bid Date: Feb 09 2023
Ada, OK
Bid Date: Aug 31 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.