BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Peoria, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As part of the City of Peoria's plan to address its aging infrastructure, a capital plan is being developed based on the Pavement Condition Index and other infrastructure analyzing technology. Wisconsin Avenue between McClure and Nebraska is a vital corridor to the East Bluff and ranks as an area in need of upgrading. This project will fund the reconstruction of that roadway from McClure to Republic and Kansas to Nebraska. The pavement from Republic to Kansas will be milled and overlaid. The city received a $3M Rebuild Downtowns & Main Streets Capital Grant from DCEO. Federal grant is COVID ARPA funds. The original project from Forrest hill to Republic has been separated into two project sheets. This project is in included in the City of Peoria FY 2023-2027 CIP. As of February 22, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$5,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
44
Bidding Soon
607
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2024

img_map_placeholder

N Wisconsin Ave, Peoria, IL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.