BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 28, 2023 at 8:00 PM

Updated November 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Schulenburg, Texas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

For Ps&e Package Questions Call: Joe Morrow Iv 403 Huck St Yoakum, Tx 77995 361/293-4399 Length: 0.40 Mi Time for Completion: 240 Working Days County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Fayette 0026-03-046 at West Navidad River Us 90 Br 2023(623) Str # 0026-03-034 Length: 0.20 Miles Fayette 0026-03-047 at Foster Creek Us 90 Br 2023(623) Str # 0026-03-035 Length: 0.20 Miles TXDOT - US 90 - Bridge Replacement EST.COST: 8,178,337.60

Award

Bridges / Tunnels

$7,055,348.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
267
Active Projects
102
Bidding Soon
2,457
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2023

June 5, 2023

Project location map

US-90, Schulenburg, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.