Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 20, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Viola, Wisconsin. Completed plans call for site work for a water / sewer project.
As of April 20, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The Project includes the following Work: Water and Sanitary Sewer System Upgrades - 2023 Infrastructure Improvements Phase 2 - to include: Contract A - Well No. 5 Public Water Supply Well - construction of a 500 gallon per minute (gpm) municipal well to a depth of 410 feet, well development, performance pump testing of constructed well, WDNR NR 809 water quality analysis, erosion control, restoration of the work area, and other miscellaneous items in conformance with the contract documents. Contract B - Well No. 5 Pumphouse, Well No. 4 Pumphouse Improvements, & SCADA System Update - construction of the Well No. 5 Pumphouse building including furnishing and installing all well pump equipment, piping, valves, accessories and controls. The building includes a pump room, chemical room, and restroom. The Well No. 5 Pumphouse contact also includes installation of a natural gas-powered emergency electrical generator, erosion control measures, site work, site piping, driveway, pavement, restoration of the work area, pump testing, water quality testing, and other miscellaneous items in conformance with the Contract Documents. Well No. 4 Pumphouse Improvements include replacement of the existing electrical unit heater with a natural gas fired furnace with A/C, installation of a natural gas-powered emergency electrical generator, erosion control measures, site work, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. The SCADA System Update includes removal and disposal of existing SCADA system equipment and installation of new equipment at the Well Nos. 3, 4 & 5 Pumphouses, Reservoir, Lift Station No. 1, Lift Station No. & Wastewater Treatment Facility. Contract C - Lift Station No. 1 Improvements - Replacement of two existing submersible sewage pumps, installation of VFDs to control replacement pumps, a flood protection wall, stormwater pumping system, wastewater bypass pumping manhole, erosion control measures, site work, site piping, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Contact D - Street & Utility Improvements - construction of Wisconsin Street (965 lineal feet) and Park Street (1,110 lineal feet) including excavation, water main, sanitary sewer, storm sewer, base aggregate, curb and gutter, concrete sidewalk, asphalt paving. Work shall also include clearing and grubbing cured in place pipe, manhole rehabilitation, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents.
Bid Results
Water / Sewer
$784,449.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 12 - Furnishings
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2023
April 13, 2023
To Be Determined, Viola, WI
Related To This Project
Viola, WI
Bid Date: Mar 14 2023
Viola, WI
Bid Date: Mar 14 2023
Viola, WI
Bid Date: Apr 07 2023
Viola, WI
Bid Date: Mar 13 2022
Viola, WI
Bid Date: Mar 08 2022
Viola, WI
Bid Date: Mar 08 2022
Viola, WI
Bid Date: Mar 11 2025
Viola, WI
Bid Date: Mar 12 2024
Viola, WI
Bid Date: Aug 01 2022
Viola, WI
Bid Date: Jun 16 2022
Viola, WI
Bid Date: Mar 08 2022
Viola, WI
Bid Date: Mar 31 2022
Viola, WI
Bid Date: Apr 01 2022
Viola, WI
Bid Date: Apr 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.