Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Morrow, Georgia. Completed plans call for site work for a water / sewer project.
As of May 10, 2023. Award of this project is anticipated on August 3, 2023. Advanced Metering Infrastructure (AMI) System Implementation - Clayton County Water Authority (CCWA) intends to acquire an Advanced Metering Infrastructure (AMI) system and related products, software and services (collectively, the "System"), for all of its approximately 89,144 water meters. Number of existing AMR meters that need to be replaced with new AMI - 84,814 o Number of existing AMR meters that need to be retrofit with a new MIU - 790 o Number of existing AMI meters that need to be retrofit with a new MIU - 3,540 o Average age of AMR meters to be replaced - 11.87 years. System Requirements- 1. Water meters equipped with AMI meter interface units (MIUs) to replace all existing water meters 2" and smaller. 2. Meter interface units, or "MIUs" capable of encoding, storing and transmitting meter reading and other data, such as tampering alerts. 3. Installation of new meters, retrofit registers (if applicable), and MIUs. 4. A CCWA-dedicated network or non-CCWA-dedicated communications service to collect and transport meter reading and other information from the MIUs to a Head End System (HES). 5. Handheld devices and software necessary to program and/or initialize the MIUs and collect installation data. 6. HES to collect, store, and manage the data which is delivered through the network. 7. A meter data management system (MDMS) that can store meter reads and consumption data and allow that data to be queried, exported and summarized, and from which standard reports can be generated. 8. A customer web portal to display interval consumption data and other meter-related information. 9. The design, installation and testing of information interfaces between the System's software components and CCWA's customer information system (CIS) and other systems, such as its field work order system. 10. All related documentation, including technical manuals and operating procedures. 11. Training of CCWA's employees in MIU installation, maintenance, diagnosis and troubleshooting, as well as system use, operation and maintenance. 12. Shipping and managing the inventory of AMI equipment during the course of project deployment. 13. Where appropriate, installation of fixed data collection units, including the communications links between those collection units and the HES. 14. Provision of all necessary radio licenses, firmware, third party software or operating systems to ensure a complete and working system. 15. Satisfactory testing of all software, hardware and procedures prior to the deployment of the System according to the system testing and acceptance process set forth in the contract, and satisfactory testing of system performance at the completion of the project or at major milestones. 16. Coordination, scheduling, communications and documentation of all installation services. 17. Project management to ensure all products and services are coordinated. CCWA encourages Small Local, Minority and Women-Owned businesses to participate and respond to this proposal request. his project will be funded by the State Revolving Loan Fund (SRLF) and will be subject to Georgia Environmental Finance Authority (GEFA) General and Special Requirements, which includes a Disadvantaged Business Enterprise (DBE) goal. MBE (4%), WBE (4%) To be considered, all questions must be received in writing by 2:00 p.m. local time on Monday, April 3, 2023, via email to CCWA_Procurement@ccwa.us. All responses to proposers' questions will be issued in the form of an Addendum by email.
Post-Bid
Water / Sewer
$300,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
17
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
April 27, 2023
May 29, 2023
May 29, 2026
Multiple Locations, Morrow, GA
Related To This Project
Morrow, GA
Bid Date: Apr 04 2023
Morrow, GA
Bid Date: Mar 08 2023
Morrow, GA
Bid Date: Mar 14 2023
Morrow, GA
Bid Date: Apr 04 2023
Morrow, GA
Bid Date: May 17 2023
Morrow, GA
Bid Date: May 19 2023
Morrow, GA
Bid Date: Jun 26 2023
Morrow, GA
Bid Date: Jul 20 2023
Morrow, GA
Bid Date: Feb 21 2023
Morrow, GA
Bid Date: Mar 07 2023
Morrow, GA
Bid Date: May 02 2023
Morrow, GA
Bid Date: Mar 21 2023
Morrow, GA
Bid Date: Jan 31 2023
Morrow, GA
Bid Date: Oct 04 2022
Morrow, GA
Bid Date: Feb 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--