BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Everett, Washington. Contact the soliciting agency for additional information.

This Contract is for complete grounds and irrigation maintenance work at the DISTRICTS landscaped sites as set forth in these Specifications. Work includes the furnishing of all supervision, labor, tools, appropriate specialized equipment, materials, work and pesticide application records, transportation, and proper debris disposal necessary to perform all work as specified and to maintain all properties in a safe, presentable, and healthy condition. Work under this contract is categorized as Routine Landscape Maintenance and Scheduled Maintenance. The DISTRICT reserves the right to have work performed at these sites either by its own staff or by other CONTRACTOR’S. Scheduled maintenance tasks are performed at a less frequent interval than routine landscape maintenance. These tasks include but are not limited to curb and gutter cleaning, storm water facility maintenance, pruning, irrigation system servicing, fertilizer application, brush clearing, catch basin clean out and woodland cut back. Engineer's Estimate: $75,000.00 The initial term of this Contract shall commence upon the date specified in the DISTRICT’S written Notice to Proceed and continue for a period of one (1) year thereafter. The DISTRICT reserves the right, at its sole option, to renew this Contract on the same terms and conditions (except as to price, as hereinafter specifically set forth) for up to four (4) additional consecutive terms of one (1) year each, upon at least sixty (60) days prior written notice to CONTRACTOR prior to the expiration of the then-current Contract term. In the event that the DISTRICT exercises either or both of such options, the contract prices for each of years two (2), three (3), four (4) and five (5) shall increase or decrease in an amount corresponding to the percentage increase or decrease in the U. S. Department of Labor, Bureau of Labor Statistics, Consumer Price Index (CPI) for the greater Seattle, Tacoma, Bremerton area during the previous contract term; provided that in no event shall the amount of any such annual price increase exceed three percent (5%).

Post-Bid

Municipal

$130,000.00

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
36
Bidding Soon
966
All Active Projects
404
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2023

April 14, 2023

img_map_placeholder

Multiple Locations, Everett, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.