Site work and paving for a sidewalk / parking lot in Cedar Rapids, Iowa. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Paving Replacements Washington High School Bid Security shall be submitted with each bid as security the successful bidder will enter into a contract for the work bid and shall furnish after the award of contract corporate surety bond or bonds, acceptable to the owner, for the faithful performance of the contract in the amount equivalent to 100% of the amount of the contract. 1. Bid security shall be in the amount of 5 percent of the bid amount. 2. Bid security shall be submitted in SEPARATE ENVELOPE labeled as Bid Security along with Project Name and Submitting Company Name. 3. Bid Security shall be in the form of a cashier's check or certified check drawn on a bank in Iowa or a bank chartered under the laws of the United States of America, or a certified bank share draft drawn on a credit union in Iowa or chartered under the laws of the United States of America or a bid bond with corporate surety satisfactory to the Owner. 4. The bid security will be held by the Owner until a contract is fully executed and bonds are approved by the Owner Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time. 1. Work to Begin on: June 1, 2023, or first day after the last day of school whichever is later. Second Shift work (after 3:30 pm) may begin immediately upon award of the contract. 2. Work Substantially Complete on or before: August 4, 2023. 3. Final Project Completion on or before: September 29, 2023. It is the intent of the Owner to award a contract to the lowest responsible, responsive bidder provided the bid has been submitted in accordance with the bidding requirements. The Owner reserves the right to waive informalities or irregularities. The Owner reserves the right to reject any or all bids Paving Replacements Washington High School Bid Security shall be submitted with each bid as security the successful bidder will enter into a contract for the work bid and shall furnish after the award of contract corporate surety bond or bonds, acceptable to the owner, for the faithful performance of the contract in the amount equivalent to 100% of the amount of the contract. 1. Bid security shall be in the amount of 5 percent of the bid amount. 2. Bid security shall be submitted in SEPARATE ENVELOPE labeled as Bid Security along with Project Name and Submitting Company Name. 3. Bid Security shall be in the form of a cashier's check or certified check drawn on a bank in Iowa or a bank chartered under the laws of the United States of America, or a certified bank share draft drawn on a credit union in Iowa or chartered under the laws of the United States of America or a bid bond with corporate surety satisfactory to the Owner. 4. The bid security will be held by the Owner until a contract is fully executed and bonds are approved by the Owner Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time. 1. Work to Begin on: June 1, 2023, or first day after the last day of school whichever is later. Second Shift work (after 3:30 pm) may begin immediately upon award of the contract. 2. Work Substant Paving Replacements Washington High School Bid Security shall be submitted with each bid as security the successful bidder will enter into a contract for the work bid and shall furnish after the award of contract corporate surety bond or bonds, acceptable to the owner, for the faithful performance of the contract in the amount equivalent to 100% of the amount of the contract. 1. Bid security shall be in the amount of 5 percent of the bid amount. 2. Bid security shall be submitted in SEPARATE ENVELOPE labeled as Bid Security along with Project Name and Submitting Company Name. 3. Bid Security shall be in the form of a cashier's check or certified check drawn on a bank in Iowa or a bank chartered under the laws of the United States of America, or a certified bank share draft drawn on a credit union in Iowa or chartered under the laws of the United States of America or a bid bond with corporate surety satisfactory to the Owner. 4. The bid security will be held by the Owner until a contract is fully executed and bonds are approved by the Owner Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time. 1. Work to Begin on: June 1, 2023, or first day after the last day of school whichever is later. Second Shift work (after 3:30 pm) may begin immediately upon award of the contract. 2. Work Substantially Complete on or before: August 4, 2023. 3. Final Project Completion on or before: September 29, 2023. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder. This project has a target for Targeted Small Business participation of ten percent (10%). Bidders shall be prepared to submit a performance bond and payment bond and a two year maintenance bond conditioned on the faithful performance of the contract. Out-of state bidders shall be prepared to submit an Out-of-State Contractor Bond to the Iowa Division of Labor in accordance with Chapter 91C of the Code of Iowa It is the intent of the Owner to award a contract to the lowest responsible, responsive bidder provided the bid has been submitted in accordance with the bidding requirements. The Owner reserves the right to waive informalities or irregularities. The Owner reserves the right to reject any or all bids Complete on or before: August 4, 2023. 3. Final Project Completion on or before: September 29, 2023. It is the intent of the Owner to award a contract to the lowest responsible, responsive bidder provided the bid has been submitted in accordance with the bidding requirements. The Owner reserves the right to waive informalities or irregularities. The Owner reserves the right to reject any or all bids

Award

Sidewalks / Parking Lot

$611,950.00

Public - City

Paving, Site Work

10

10

2

5

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
43
Bidding Soon
445
All Active Projects
223
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

June 1, 2023

img_map_placeholder

2205 Forest Dr SE, Cedar Rapids, IA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.