Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 18, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Lake Villa, Illinois. Completed plans call for site work for a water / sewer project.
The work, officially known as "Northern Interceptor Manhole Rehabilitation" consists of sanitary sewer manhole rehabilitation of 20 manholes on the gravity sewer from IL Route 59 East along Petite Lake Road. WAGE RATES: Contractors are required to pay not less than the prevailing wage rates on the project as established by the State of Illinois, Department of Labor, pursuant to Illinois Statutes. Copies of the prevailing wage rate determination will be on file at the addresses listed for inspecting Bidding Documents and will be included in the Contract Documents. OTHER PROVISIONS: The Contract letting shall be subject to the provisions of the Illinois Statutes. In connection with the performance of work under this contract, the Contractor agrees not to discriminate against any employees or applicant for employment because of age, race, religion, color, handicap, sex, physical condition, developmental disability, or national origin. This provision shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff and termination; rates of pay or other forms of compensation; selection for training, including apprenticeship. The Contractor further agrees to post in conspicuous places, available for employees and applicants for employment, notices setting forth the provisions of this non-discrimination clause. BID SECURITY: Bids shall be accompanied by a certified or bank check or a Bid Bond on the prescribed form payable to the Owner in an amount not less than 5% of the Total Bid Amount as guarantee, that if the Bid is accepted, the Bidder will execute and file the Agreement, Bid Bonds will be accepted electronically, and MUST be uploaded. Performance and Payment Bonds, and Insurance Certifications, as required by the Contract Documents, within 15 days after the Notice of Award. BID REJECTION/ACCEPTANCE: The Owner reserves the right to reject any and all Bids, waive any informalities in bidding or to accept the Bid or Bids, which best serve the interests of Owner. BID WITHDRAWAL: No Bid shall be withdrawn for a period of 60 days after the scheduled opening of the Bids without the consent of the Owner.
Bid Results
Water / Sewer
$77,102.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
