BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Site work and paving for a mixed-use development in Perkasie, Pennsylvania. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Update: Langhorne-Yardley/Maple Pt. Crossing Project is included in Middletown Township Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Crossing major roads safely is a critical component of encouraging pedestrianism and creating reliable alternatives to single-occupancy vehicles. A crossing along Langhorne-Yardley Road near Maple Point Middle School is proposed. This project would add an overhead flashing pedestrian signal to alert drivers of pedestrians crossing the roadway. A similar signal was installed recently by a new development on Walnut Way. The signal would be located at the existing striped crosswalk at the intersection of Langhorne Yardley Road and Maple Point Drive. A second signal will be added near the existing stiped crosswalk at the intersection of Langhorne-Yardley Road and Briggs Road as part of the PennDOT construciton project on Langhorne-Yardley Road. Both crosswalks connect neighborhoods to existing trails and public facilities. This project is expected to have a negligible impact to operating costs, as the modest increase in utility costs will be offset by the existing safety concerns at these crossings. This project will be paid for from the Capital Fund. This project is included in the Township's FY 2024-2028 Capital Improvement Program. As of September 4, 2024, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$250,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
965
Active Projects
458
Bidding Soon
7,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

Langhorne - Yardley & Maple, Perkasie, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.