BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Orem, Utah. Completed plans call for site work for a water / sewer project.

Construction work, in general, consists of the following: Central Zone Pipeline Replacement: Approximately 45 feet of 30-inch ductile iron, 1,400 feet of 24-inch ductile iron, sections of 16-inch, 12-inch and 8-inch ductile iron culinary water pipe at an average bury depth of 4 feet to top of pipe, including valves, fittings, 9 existing waterlines tieovers, 7 service lateral tie-overs, asphalt removal, concrete removal and replacement, and abandoning the existing waterlines and valves. Springwater Zone Pipeline Installation: Approximately 5,000 feet of 24-inch HDPE, 300 feet of 24-inch ductile iron, and sections of 12-inch ductile iron culinary water pipe with bury depths ranging from 15 to 5 feet to top of pipe, including valves, fittings, flow control valve vault, PRV vault, and asphalt removal and replacement. There is a small section of 8-inch sewer realignment and one sewer manhole as part of this section. Stormwater/Overflow Pipeline: Approximately 1,400 feet of 30-inch HDPE, 3,000 feet of 30- inch RCP, sections of 18-inch, 15-inch, and 12-inch polypropylene stormwater pipe at an average bury depth of 5 feet to top of pipe, including 72-inch diameter manholes, 60-inch diameter manholes, existing sump tie-overs, service lateral tie-overs, asphalt removal, and concrete removal and replacement. Road Resurfacing: Full depth reconstruction of road over installed utilities. The project is located in Orem, Utah. The pipelines will be installed along 400 South from 400 West to 600 West; then along 600 West from 400 South to 800 South; then along 800 South from 600 West to 800 West.

Post-Bid

Water / Sewer

$175,000.00

Public - City

Site Work

37

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
83
Bidding Soon
1,003
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2023

April 13, 2023

Project location map

Multiple Locations, Orem, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.