EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 16, 2023 at 8:00 PM

Updated October 1, 2024

Demolition, site work, paving, renovation and addition to a mixed-use development in Lake Zurich, Illinois. Completed plans call for the addition of a 11,000-square-foot, three-story above grade educational facility; for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; road / highway; and for paving for a road / highway.

All Contractors shall use the bid day label provided with their Bid Form. This 1,500 SF three-story addition and 9,500 SF complete interior and exterior renovation consists of new MEPs, finishes, steel stairs, elevator, and roofing. Exterior sitework will be adjusted to reflect a new parking lot and landscaped area. Trade Bids: 04A-1 Masonry, 06A-1 General Trades, 07A-1 Roofing, 08B1Aluminum, Glass, and Glazing, 09D-1 Acoustic Ceiling,09F-1 Flooring, 09G-1 Painting, 21A-1 Fire Protection, 22A-1Plumbing, 23A-1 HVAC, 26A-1 Electrical, 31A-1Excavation, 32A-1 Asphalt Paving, and 32C-1 Site Concrete Prospective bidders should contact Kari Christensen at Lamp Incorporated (kchristensen@lampinc.net or 847-741-7220 x 315) to be placed on the bid list. All Contractors wishing to bid on this project must have a Lamp Incorporated Qualification Statement on file, updated within the last year. Contractors. A Bid Bond or Certified Check in the amount of 10% of the bid is to accompany the Bid Form. In addition, the successful bidder must furnish a Performance Bond and Labor and Material Payment Bond in an amount equal to100% of the bid amount, with sureties approved by theOwner and Certificate of Insurance within ten (10) days of the award of the Contract. The successful bidder is required to pay the Prevailing Wage for work under this Contract and shall submit certified payroll records in compliance with the PrevailingWage Act (820 ILCS 130/1-12). This Project is Tax Exempt. The Board of Education of Lake Zurich Community Unit School District 95 reserves the right to reject any or all bids or any part thereof and to waive any technicality irregularity.

Post-Bid

Educational

$6,042,000.00

Public - County

Addition, Demolition, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
133
Bidding Soon
2,863
All Active Projects
1,249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2023

April 14, 2023

img_map_placeholder

Multiple Locations, Lake Zurich, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Addition and Renovations at Transition Program Facility - Bid Release 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.