Published April 20, 2023 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a civil project in Ellwood City, Pennsylvania. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The estimates are: Contract 1- GC $4,500,000 and Contract 2- EC is $600,000 A general description of each contract is listed below: Wampum Pump Station - General and Electrical Construction Contract 1 General Construction of the approximately 2,300 liner feet of 18-inch sanitary sewer, approximately 5,200 linear feet of 18-inch sanitary force main, new sanitary sewer pump station (Wampum Pump Station) and building, and site work and restoration. Contract 2 Electrical work for Wampum Pump Station including wiring, motor control centers, standby generator, SCADA and related work. Each bid must be accompanied by proposal security in the form of a certified check, bank cashier's check, treasurer's check, or bid bond in an amount equal to not less than ten percent (10%) of the total bid price in accordance with provisions contained in the "Instructions to Bidders" section of the specifications. Proposal Security shall be made payable to the Borough of Ellwood City. Additional Doc Acq Note: Bidders or vendors requesting next day or special mailing will be responsible for all mailing or shipping charges. Bidders must be on record at the issuing office as an official plan holder. Addenda, if any, will be issued to only those persons or companies who have purchased a full set of contract documents. Contractors must comply with Davis Bacon Wage Rate Determinations, as specified in the Contract Documents. This project is being federally funded by EPA financial assistance dollars and therefore requires all contractors to demonstrate compliance with Federal Executive Orders 11625, 12138 and 12432 and EPA Regulations at 40 CFR Part 30 et a., through the detailed documentation of solicitation of Disadvantage Business Enterprises (DBEs). Contractors must demonstrate the Six Good Faith Efforts to identify and solicit DBE firms that are potential sources for any procurement action in the areas of project construction, equipment, services and supplies by including state qualified small businesses, and minority and women owned business enterprises in the bidding process. Except as otherwise expressly permitted by law, no bidder may withdraw its bid for a period of 60 days after date of bid opening. The Borough of Ellwood City reserves the right to reject any or all bids, to accept or reject any part of any bid, and to waive any and all informalities in connection therewith. Bid results:- Electrical Subcontractor Penn-Ohio Electric $847,000 General Contractor Pollard Land Services, Inc. $6,299,875

Bid Results

Water / Sewer

$7,146,875.00

Public - City

New Construction, Site Work

44

34

25

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Panel Doors, Hardware, Glazing, Louvers and Vents, Louvers
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Storm Drainage, Sump Pumps, Plumbing Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Air Outlets and Inlets, Central Cooling Equipment, Packaged Water Chillers, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Battery Chargers, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Aggregate Surfacing, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
90
Bidding Soon
1,305
All Active Projects
606
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2023

May 1, 2023

img_map_placeholder

To Be Determined, Ellwood City, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wampum Pump Station - General and Electrical Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.