BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Fort Scott, Kansas. Completed plans call for the renovation of a stadium.

For the installation of a new gym floor within Arnold Arena on the campus of Fort Scott Community College. Below are the defined requirements for the project and the services requested. Project Specifications: o Project timeline- Start date 3/25/2023. Expected completion date 6/25/2023. o Installation of complete floor system consisting of installation of 6 mil poly vapor barrier lapped and sealed. o Installation of 7/16" rubber pads to subfloor approx. 12" o.c. o Installation of lower subfloor. o Installation of upper subfloor at a 45-degree angle to lower layer using construction adhesive and 1" staples. o Both subfloor layers shall be 7/16" OSB. o Installation of 7/16" thick third and better grade maple flooring in adhesive. o Sand floor to a smooth surface. o Apply two coats of MFMA approved polyurethane sealer and finish. o Apply game lines for Basketball and Volleyball per regulations including solid painted keys. o Installation of 3"x4" rubber vent cove base at wall lines. o Installation of two 7' long and one 3' long slope compliant ADA ramps and aluminum ramps at other entries. o Includes Furnish and Install of 4 new volleyball sleeves and covers. o Additional floor artwork will include: - Fort Scott & Greyhounds 3' tall one color once each - KJCCC & NJCAA 2' tall one color once each - Fort Scott Greyhounds 18" tall one color two places - FSCC with Greyhound logo 18" long two colors one place o Warranty details must be stated in the proposal. o Contractor Requirements and notices: - Contractor must be bonded and furnish certificate of liability insurance, and workers complementation coverage. - Contractor must provide three references submitted with proposals. - Fort Scott Community College is not responsible for loss of equipment or materials left on campus. - Fort Scott Community College will not be liable for any errors or omissions in supplier proposals. Suppliers will not be allowed to change proposal documents after the proposal due date without permission from Fort Scott Community College personal. Fort Scott Community College reserves the right to refuse any and all bids.

Award

Educational

$189,360.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
26
Bidding Soon
344
All Active Projects
158
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2023

April 10, 2023

img_map_placeholder

2108 S Horton St, Fort Scott, KS

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.