BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Marietta, Georgia. Completed plans call for site work for a water / sewer project.

As of June 28, 2023 the project not been awarded. A timeline for construction has not been confirmed. Sealed Bid SW2238 Request for Bids FY23 Stormwater Drain Rehabilitation (Lining of approx. 1,800 LF of 24 to 48-inch storm sewers, internal point repairs, and rehabilitation of storm drainage structures) The Project consists of the cleaning and rehabilitation by Machine Spiral Wound Liner Method using PVC Profiles or UV CURED-In-Place-Pipe (CIPP) of approximately 1,200 linear feet of corrugated metal pipe (CMP) stormwater drains 24 to 48 inches in diameter, internal point repairs in CMP stormwater drains 30 to 48 inches in diameter, replacement of approximately 140 linear feet of 36 inch diameter CMP Pipe, rehabilitation of stormwater inlet and junction structures, and restoration of damaged ground areas adjacent to existing stormwater drains A. The Work to be performed under this Contract shall consist of furnishing all plants, tools, equipment, materials, supplies, and manufactured articles and furnishing all labor, transportation, and services, including fuel, power, water, and essential communications, and performing all work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The Work shall be complete, and all work, materials, and services not expressly indicated or called for in the Contract Documents, which may be necessary for the complete and proper construction of the Work in good faith, shall be provided by the Contractor as though originally so indicated, at no increase in cost to the Owner. B. The quantities shown on the bid form are estimates for the work including the intended rehabilitation method based upon the available information. The assigned means, methods and quantities described herein are subject to revision by the Owner for various reasons including but not limited to, unforeseen utility conflicts, discovery of subsurface rock strata, unforeseen pipeline encasement, etc. As such, a unit price contract type has been selected to prosecute the work and is not intended to be a guarantee for a minimum amount of work. The Contract comprises the Spiral Wound PVC Profile Lining rehabilitation of selected portions of the stormwater drain system and as shown on the Drawings. The Work includes but is not limited to the following items: 1. Machine Spiral Wound Liner Method Using PVC Profiles or UV Cured-InPlace Pipe (CIPP) of approximately 1,200 linear feet of 24-Inch to 48-Inch diameter stormwater drains. 2. Internal Point Repairs in CMP Stormwater Drains 30 to 48-inches in diameter 3. Replacement of approximately 65 linear feet of 18-inch diameter CMP and 335 linear feet of 36-inch diameter CMP pipe and replacement with Dual Wall Corrugated PVC Drain Pipe. 4. Location and raising of junction boxes. 5. Rehabilitation of stormwater inlet and junction structures. 6. Restoration of damaged ground areas adjacent to existing stormwater drains. 7. Erosion control. 8. Traffic control. B. Other work associated with the above items. All Work shall be performed according to the requirements of the Contract Documents. No interpretation of the meaning of the drawings, specifications or other pre-bid documents will be made to any Bidder orally. Every request for such interpretation should be in writing, addressed to the Owner, and in order to be given consideration must be received by the close of business on the Friday, March 14, 2023. Any questions concerning this bid should be directed in writing via letter, facsimile, or email to: Mr. Roger Ball Purchasing Director Cobb County Purchasing Department 122 Waddell Street NE Marietta, GA 30060 FAX: (770) 528-8428 purchasing@cobbcounty.org and Mr. Eric W. Olson, P.E. Manager, Engineering & Records Div. Cobb County Water System 660 South Cobb Drive Marietta, GA 30060-3105 FAX: (770) 419-6335 eric.olson@cobbcounty.org With copy to: Bao Nguyen, Project Engineer Cobb County Water System 660 South Cobb Drive Marietta, GA 30060-3105 Bao.Nguyen@cobbcounty.org *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$1,863,060.00

Public - County

Site Work

10

12

4

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
89
Bidding Soon
1,493
All Active Projects
651
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

April 24, 2023

img_map_placeholder

Multiple Locations, Marietta, GA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.