BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Glacier, Washington. Completed plans call for site work for a bridge / tunnel.

This project will replace existing fish barrier culvert crossings on I-5 at South Unnamed Tributary to Friday Creek (milepost 240.92 and 240.95, Washington Department of Fish and Wildlife Sites 995236, 995235, 995234, 995233, 995232, and 995245), Middle and North Unnamed Tributaries to Friday Creek (mileposts 240.99 to 241.10, Washington Department of Fish and Wildlife Sites 995240, 995239, 995238, 995237, 995241, 995259, 995246), Lake Creek draining to Lake Samish (milepost 245.76, Washington Department of Fish and Wildlife Site FR75), Unnamed Tributary to Lake Creek (mileposts 246.12 and 246.22, Washington Department of Fish and Wildlife Sites 995256 and 995255), and Chuckanut Creek (milepost 246.75, Washington Department of Fish and Wildlife Site 995411) with fish passable structures. A state and federally funded project with a 5% small business enterprise goal and a 3% veteran owned business goal. Estimated value $100,000,000 - $120,000,000 WADOT - I-5, Tributaries to Friday, Lake and Chuckanut Creeks - Fish Passage Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Anticipated Award Date: 02/07/2024

Award

Bridges / Tunnels

$120,000,000.00

Public - State/Provincial

Site Work

1

1

223

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
35
Bidding Soon
1,560
All Active Projects
632
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2024

June 19, 2024

img_map_placeholder

Multiple Locations, Glacier, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.