BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2025 at 7:00 PM

Updated January 15, 2025

Renovation of an educational facility in South Holland, Illinois. Completed plans call for the renovation of a educational facility.

NOTICE IS HEREBY GIVEN by South Holland School District 150 that sealed bids will be received for Interior Renovation Project at Greenwood School. Bids will be received for the following bid packages: Bid Package #1 - Asbestos Abatement; Bid Package #2 -Masonry, Bid Package #3 - Carpentry and General Construction, Bid Package #4 - Flooring; Bid Package #5 - Acoustical Ceilings; Bid Package #6 - Painting, Bid Package #7 - Gymnasium Equipment, Bid Package #8 - Plumbing, Bid Package #9- HVAC, Bid Package #10- Electrical, Bid Package #11 - Low Voltage. All proposals or bids offered must be accompanied by a bid bond in a form acceptable to the School Board, cashiers check, or certified check made payable to School District 150 in the amount of not less than five percent (5%) of the total amount of the proposal as a guarantee that if the proposal is accepted, a contract shall be entered into and the performance of the contract is properly secured. No bid shall be withdrawn after the opening of the proposals without the consent of School District 150 for a period of sixty (60) days after the scheduled time of closing bids. This project titled "GREENWOOD SCHOOL INTERIOR RENOVATIONS" consist of the following major elements: Note for a more definitive breakdown, refer Section 00 24 13 - Scope of Bids. 1. Interior gymnasium, office, storage room, and corridor renovations. 2. Electrical, plumbing, and mechanical work to support renovation and remodeling work. 3. All other work indicated on the drawings and in the project manual for this project. B. All work on this project will be awarded to multiple Prime Contractors. C. Any required asbestos abatement work in existing building will be performed by a separate abatement contractor under the direction of the Owner's consultant. * Yesterday evening at the School District's Board meeting, it was decided to reject all bids for this project* Project Awarded to MTB Flooring

Award

Educational

$149,014.00

Public - City

Renovation

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

31

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
436
Active Projects
247
Bidding Soon
3,250
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

March 10, 2025

Project location map

16800 Greenwood Ave, South Holland, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.