BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Farmington, New Mexico. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of May 16, 2023, project was awarded to Winters construction in the amount of $382,459.61. When utilizing the County's website, please complete the Acknowledgement Form that is posted within the Project Manual so you can be listed as a Plan Holder, and will automatically receive addendums, if issued. You are reminded that you are solely responsible for checking the County's website for updates. Please feel free to visit our Website, select 'Bids, Proposals & Vendors' then 'Current Bids/Proposals.' Hard copies of the project will NOT be provided. Bid Security in the amount of 5% of the total Bid shall accompany each Bid in accordance with instruction to bidders. All bidders shall hold their bids for Sixty (60) days after actual date of bid opening. NOTICE OF REGISTRATION REQUIREMENT. Bidders are reminded that in order to be considered for bid award, all contractors (including their subcontractors if at a specific cost threshold) must be registered under the Labor Enforcement Fund with the New Mexico Department of Workforce Solutions on the date bids are unconditionally accepted for consideration for bid award and must remain actively registered in order to perform work under this solicitation. The Contractor selected for award of a contract shall provide documentation to verify compliance with this paragraph prior to execution of a contract. The County reserves the right to reject any or all Bids and to waive informalities or irregularities in the Bidding. Contractor performing this work shall furnish all material, labor, tools, expendable equipment, utility and transportation services and all incidental items necessary to perform and complete in a workmanlike manner, the Work required for the sewer lift station improvements at McGee Park. Furnish and install new 6'0" diameter Duplex Pre-Manufactured fiberglass lift station with pumps, new electrical service, 6'0" Valve Vault and Meter Vault Assemblies respectively, excavation, dewatering, new 6'0" chain link fencing with gate, 6" diameter HDPE Piping, 6" valve/valve box, installation of pressure sanitary sewer cleanout (detail 4-D-118), demolition of existing lift station and other miscellaneous items of work as per Plans and Specifications complete.

Award

Water / Sewer

$382,460.00

Public - County

Renovation, Site Work

11

16

4

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
1
Bidding Soon
52
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

August 14, 2023

img_map_placeholder

41 Rd 5568, Farmington, NM

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.