Published April 27, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a power facility in Virginia Beach, Virginia. Completed plans call for the renovation of a power facility.

All terms and conditions of N4008519D9194/9195/9196/9197/9198 IDIQ Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not restated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue please contact Abigail R eed at (757) 277-4411, or email at abigail.m.r eed13.civ@us.navy.mil. Amendments will be posted directly to https://sam.gov/ under Contract Opportunities. Offerors are responsible for referring back to this site for any amendments to the RFP. The specifications, drawings, and other pertinent attachments are posted on https://sam.gov/ under "Attachments/Links." NAVFAC Solicitation No.: N40085-23-R-2646 NAVFAC Specification Work Order Nos.: 1665514 (Attachment A) NAVFAC Drawing Nos.: 1 sheet in PDF format in DB-RFP file (Page 149) Title: Replace Electrical Substation 4 Location of the work: The intersection of 3rd Street and F Avenue, Naval Air Station Oceana Description of the work: This project will have a Base Bid scope and a Bid Option scope. The Contractor's bid proposal shall provide a separate cost for each scope. The Base Bid scope and the Bid Option scope are defined in section G40 Site Electrical Utilities below. Overall Project Scope: The combined Base Bid and Bid Option scopes will replace the following existing NAS Oceana Substation 4 equipment, to include all switchgear, transformers, tap changers, circuit breakers, relays, control systems, metering equipment, station power equipment, batteries, SCADA, and all other electrical equipment. New equipment will be installed in place of the existing equipment. The new substation equipment capacity will be equal to or greater than the existing substation equipment, and will be fully compatible with the existing NAS Oceana electrical utility system. Existing 35kV line side and 5kV load side conductors will be reused, extended as needed, and terminated to the new equipment. Temporary substation equipment will be provided to maintain electrical service during installation of new equipment, and removed when new substation equipment is fully operational. Estimated Budget Amount or Price Range: In accordance with FAR 36.204 Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $1,000,000 and $5,000,000. NAICS Code: 236220 - Commercial and Institutional Building Construction Time for completion: Contract completion date is 720 calendar days. The days are calculated from date of task order award, which includes the initial 15 days allowed for distribution of the task order award, submission and approval of insurance, bonding and other requirements set forth in the task order/MACC. Task order award is considered notice to proceed. Wage Rate Requirements: Department of Labor (DoL) General Decision Number: VA20230167 dated 13 January 2023 applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination may be issued via amendment. REPLACE ELECTRICAL SUBSTATION 4 Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $350.13 for each calendar day of delay until the work is completed or accepted. Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility Services - The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge. Record Shop Drawings: In accordance with FAR 52.236.21, Specifications and Drawings for Construction Alternate I (Apr 1984) record shop drawings and reproducible copies of these record drawings are/are not required. Government Furnished Property: There is no Government Furnished Property. PROVISIONS/CLAUSES INCORPORATED BY REFERENCE FAR 52.219-14 Limitations on Subcontracting (Jan 2017) FAR 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 FAR 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) FAR 52.236-6 Superintendence by the Contractor (Apr 1984) Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The proposed task order will be awarded to the responsible offeror, offering the best value to the Government. For this task order, to make a determination of best value, the Government shall evaluate each offeror on price only and the basis for award will be low price. Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or or $3,000,000, whichever is less. Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award. Proposal Acceptance Period: 120 days from receipt of offers. OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF FUNDS ARE NOT AVAILABLE, NO AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION. OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS RESULTING FROM THIS SOLICITATION. Site Visit: Date and Time: Tuesday, 7 March 2023, 10:00 EDT REPLACE ELECTRICAL SUBSTATION 4 Location: Intersecion of 3rd Street and F Avenue, Naval Air Station Oceana, Virginia Beach, Virginia Badging: Contractor personnel that do not have DBIDS access for Naval Air Station Oceana, must follow and adhere to the instructions contained within Attachments C, D, and E, ensuring enough time for processing, prior to the site visit date. Attachments C, D, and E are provided. If you are registered with DBIDS or after obtaining your one-day visitor's pass in accordance with Attachments C, D, and E, all participating contractors shall proceed to the Intersecion of 3rd Street and F Avenue, Naval Air Station Oceana for sign-in at 10:00am. This will be the ONLY Government scheduled site visit. Pre-Propsal Inquiries (PPIs): PPIs must be submitted in writing on the attached Pre-Proposal Inquiry Form (ATTACHMENT F) to Abigail R eed at abigail.m.r eed13.civ@us.navy.mil no later than 10 March 2023 at 14:00 PM EST Proposal Due Date: 27 March 2023 no later than 1400 EDT. LATE PROPOSALS WILL NOT BE CONSIDERED. Any MACC awardee that is unable to submit a proposal on this solicitation must provide written notification to the Contracting Officer within (5) working days from receipt of solicitation. A MACC awardee can only elect to withdraw from submitting a proposal on (3) task order solicitations per contract year. Proposal Delivery Information: Proposals may be sent via Federal Express (FedEx), United Parcel Service (UPS), emailed*, or hand-carried to the following address: Mailing Address: ATTN: Abigail R eed Naval Facilities Engineering Systems Command Mid-Atlantic Public Works Department Oceana Facilities Engineering and Acquisition Division Building 820, 2nd Floor 953 Hornet Drive Virginia Beach, VA 23460-2190 *Email Submissions: Please note, if you email your proposal, ensure ALL required submission items are attached to the email or you will be deemed non-responsive. The date/time received noted on the Contract Specialist's computer is the date/time that will be recorded on your proposal. It will NOT be the date/time you sent your email. Ensure you send your proposal/email with all attachments early enough that your firm does not miss the deadline due to any server issue on either your side or the Government's. If you wish to send your proposal via email due to COVID, etc., send it to Abigail.m.reed13.civ@us.navy.mil. The Proposed Task Order will be awarded to the responsible offeror which offers the LOWEST PRICE to the Government. The Government shall evaluate each offeror on the following criteria: PRICE A. Price Submission: REPLACE ELECTRICAL SUBSTATION 4 (1) Solicitation Submittal Requirements: Offeror shall submit the following: o Cover page that includes: - Solicitation Number - Solicitation Title - Prime Contractor Name - Prime Contractor Address - Phone Number - Fax Number - Cage Code - Employer Identification Number (EIN) - Point of Contact - Point of Contact Phone Number - Point of Contact Email o Price Proposal Form (Attachment G) o Acknowledged Amendments (if applicable) o Copy of Reps & Certs from SAM (sam.gov) o Completed copy of Provision 52.204-24 (Attachment J) o Bid Bond B. Basis of Evaluation: 1. The Government will evaluate price based on the total price. Total price consists of the base bid plus option(s) (if applicable) requirements. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price: a. Comparison of proposed prices received in response to the RFP. b. Comparison of proposed prices with the Independent Government Cost Estimate (IGCE). c. Comparison of Proposed prices with available historical information. d. Comparison of market survey results. EVALUATION 1. The Govermnent reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract and to award the contract to the offeror submitting the lowest price acceptable proposal. 2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range. 3. From all proposals deemed eligible for award, the lowest price will be chosen. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Power Plant

$5,000,000.00

Public - Federal

Renovation

3

10

12

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Temporary Environmental Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Contaminated Site Material Removal, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Polychlorinate Biphenyl Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Membrane Roofing, Modified Bituminous Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Roofing, Joint Protection, Preformed Joint Seals, Compression Seals
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Windows, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Portland Cement Plastering, Gypsum Board, Tiling, Ceramic Tiling, Flooring, Resilient Flooring, Wall Finishes, Painting and Coating, Painting, Exterior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Bath Accessories, Exterior Specialties, Exterior Protection
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Audio-Video Equipment, Projection Screens
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Systems Furniture, Other Furnishings, Site Furnishings
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Off-Gassing Mitigation, Radon Mitigation, Excavation and Fill, Excavation, Trenching, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Storm Drainage Utilities, Culverts, Electrical Utilities, Site Grounding, Communications Utilities, Communications Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Hooks, Lifts

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
36
Bidding Soon
492
All Active Projects
231
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2023

June 13, 2023

img_map_placeholder

3rd Street and F Avenue, Virginia Beach, VA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.