Site work and paving for a mixed-use development in Webster, South Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of April 12, 2023, project was awarded to B&B Contracting, awarded amount is $2,026,496.02.** For Water System Improvements Phase II City of Webster (Owner) is requesting Bids for the construction of the following Project: Water System Improvements Phase II, A-8743 The Project includes the following Work: The project consists of the installation of new watermain piping, valves, curbstops, water service piping and fire hydrants. Work also consists of asphalt and concrete street repair, concrete curb and gutter, gravel street repair, sidewalk repair, storm sewer repair along with other miscellaneous work. Bids are requested for the following Contract: Base Bid Bidders on this work will be required to comply with the Presidents Executive Order Nos. 11246 as amended, 11518, and 11625 as amended. The requirements for bidders and contractors under these orders are explained in the specifications. The low responsive bidder will be required to certify to compliance with the American Iron and Steel provision of the Consolidated Appropriations Act of 2014. This certification form may be found on page AIS-21 of the State Revolving Fund (SRF) General Conditions and must be included in the bid proposal. The low responsive bidder must assure compliance with the requirements of Public Law 115-232, Section 889, Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. This project may be partially funded using American Rescue Plan Act (ARPA) funds. As a condition of the ARPA funding guidelines, the Contractor is shall meet the following minimum requirements: Based on the "Build America, Buy America" provisions of the Infrastructure Investment and Jobs Act (IIJA) and E.O. 14005 which provide that, as appropriate and to the extent consistent with law, a preference will be provided to Contractors for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products.) The Contractor shall provide documentation of their efforts to meet the provisions of "Build America, Buy America" upon request. Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138. The requirements for bidders and contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Women's Business Enterprises (WBE) are explained in the specifications. The goals for DBE/MBE participation are 1% and WBE participation are 4%. Bidders are also reminded that not less than the minimum wages as determined by the Davis Bacon Act and set forth in the Contract Documents must be paid on this project and that the contractor and/or subcontractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. In addition to all of the above listed Federal requirements for work on this project, compliance with the contract Work Hours and Safety Standards Act, Executive Order 11375, Copeland Act, the Clean Air Act, and Water Pollution Control Act, and subsequent amendments to all of the above will be required of contractors and/or subcontractors performing work on this project. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The Issuing Office for the Bidding Documents is: Helms and Associates, 416 Production St. N. Aberdeen, SD 57401. Phone (605)225-1212 Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:00 am to 5:00 pm, and may obtain copies of the Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office Bidding Documents may be purchased from the Issuing Office during the hours indicated above. Cost does not include shipping charges. Upon Issuing Office's receipt of payment, printed Bidding Documents or electronic documents on compact disk will be sent via the prospective Bidder's delivery service. The shipping charge amount will depend on the shipping method chosen. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.

Award

Water / Sewer

$2,026,496.00

Public - City

Paving, Site Work

49

19

2

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Survey and Layout Data, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Wall and Door Protection
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Storm Drainage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Trenchless Utility Installation, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Clamps, Hooks, Slings
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
7
Bidding Soon
99
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2023

April 26, 2023

img_map_placeholder

Multiple Locations, Webster, SD


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Water System Improvements Phase II

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.