BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Beckley, West Virginia. Completed plans call for site work for a road / highway.

The Raleigh County Solid Waste Authority is seeking sealed bids for the supply and installation of the various Geosynthetics, associated materials and appurtenances for the construction of the landfill liner identified as Stage 10 Expansion Construction. A detailed bid document will be available from Alliance Consulting, Inc. in either hard or digital format. All other questions can be directed to James Allen, Executive Director or Travis Kiblinger, Director of Operations at 304-255-9335. The Raleigh County Solid Waste Authority reserves the right to reject any and all bids and to waive all formalities. The Stage 10 Expansion Construction consists of approximately 7.9 acres of geosynthetic supply and installation for a municipal solid waste landfill disposal cell. The project is outlined in more detail in the following sections of the bid and contract documents. The anticipated start date for the work is June 1, 2023. Bids are due March 22, 2023. The anticipated date for issuance of the Notice to Proceed will be discussed in the Pre-Bid Meeting. Work shall be completed in a timely manner. The Raleigh County Solid Waste Authority must have Stage 10 completed, certified and usable disposal area by August 31, 2023. 1.1.1 The Liner Contractor shall provide all labor, materials, tools, equipment, incidentals, and services necessary to construct the geosynthetic portions of the Stage 10 liner system in accordance with the Construction Drawings and Technical Specifications. However, Owner reserves the right to purchase materials through installer at manufacturer's invoice price. Owner is a taxexempt entity. 1.1.2 In the Stage 10 landfill area, the Liner Contractor (geosynthetics installer) will furnish and install, as indicated on the bid forms and as shown on the Construction Drawings, the components, including: o 40-mil Textured HDPE Secondary Geomembrane; o Double-Sided Drainage Composite for Leachate Detection; o Geosynthetic Clay Liner; o 60-mil Textured HDPE Primary Geomembrane; o 12 ounce per square yard (oz/sy) Nonwoven Geotextile; o Boot Penetrations for Leachate Detection Pipe Cleanouts; and, o Quality Control for installation of all geosynthetics materials. 1.1.3 The Liner Contractor shall submit a tentative schedule to the Owner within ten (10) days of the Notice to Proceed, indicating the starting and completion dates of the various stages of the Work. Assumptions concerning delays due to inclement weather should be stated. 1.1.4 The Liner Contractor is responsible for coordination with the Solid Waste Authority and vice versa, to prevent unnecessary delays or damage to the soil and geosynthetic components of the liner system.

Award

Roads / Highways

$936,922.00

Public - County

Site Work

10

8

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
55
Bidding Soon
713
All Active Projects
390
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 22, 2023

June 1, 2023

August 31, 2023

img_map_placeholder

200 Fernadez Dr, Beckley, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.