Published August 22, 2023 at 8:00 PM

Updated December 17, 2024

Site work and paving for a road / highway in Lino Lakes, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 1,950 S Y Remove Bituminous Pavement 1,010 L F Remove and Replace Concrete Curb and Gutter 930 C Y Excavation - Common (P) 1,850 C Y Select Granular Embankment (CV) 210 TON Type SP 9.5 Wearing Course Mix (2,C) 410 TON Type SP 12.5 Non Wear Course Mix (2,C) 560 L F 8" PVC Sanitary Sewer 450 L F 15" RCP Storm Sewer 750 L F 12" DIP Watermain 300 L F 14" HDPE Watermain (Directional Drilled) 2,200 S Y Sodding Type Lawn The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. The City Council reserves the right to reject any and all Bids and to waive any Bids received without explanation.

Award

Roads / Highways

$886,886.00

Public - City

Paving, Site Work

4

25

12

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Commissioning
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 08 - Openings

Division 08 - Openings

Windows, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties, Mail Boxes
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
39
Bidding Soon
1,025
All Active Projects
449
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2023

May 1, 2023

img_map_placeholder

Multiple Locations, Lino Lakes, MN

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Pheasant Run Reconstruction Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.