EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Boise, Idaho. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Capital City Development Corporation (CCDC) invites submission of sealed bids for the 2023 Fulton Street Improvements Project in accordance with the formal bid process outlined in Idaho CCDC appreciates your interest in meeting the needs of the agency and the citizens of Boise. A bid bond is not required. CCDC reserves the right to reject any and all proposals, to waive any irregularities in the proposals received, and to accept the proposal that is in the best interest of CCDC. The issuance of the Invitation to Bid and the receipt and evaluation of sealed bids does not obligate CCDC to award a contract. CCDC will pay no costs incurred by Bidders in responding to this Invitation to Bid. CCDC may in its discretion cancel this process at any time prior to execution of a contract without liability WORK COVERED BY CONTRACT DOCUMENTS A. The Project Scope or Work consists of all labor, equipment, temporary traffic control, staging areas, materials, products, systems, structure, finishes, accessories, furnishings, specialists, special construction, taxes, transportation facilities and services, overhead and profit necessary for and/or reasonably incidental to the entire completion of the Fulton Street Improvements Project as shown and described in the contract documents including the Drawings, Specifications and the Project Manual: Fulton Street Improvements Project, February 14, 2023. For convenience, the Work may be summarized as follows: 1. Demolition of existing street and sidewalk and the construction of new street, streetscape, stormwater facilities and sidewalk. Site improvements also include installation of subsurface utilities (including, but not limited to telecommunication and electrical utilities), site lighting, site furnishing, paving, landscape, and pressurized irrigation, as shown in construction drawings. B. Type of Contract: Project will be constructed under one contract awarded to a single Contractor, who shall be responsible for completion of the Project, if the CCDC Board of Commissioners decides to award a contract. Owner reserves the right to make revisions to the contract provisions prior to presenting the final contract for execution. Question Deadline 03/14/2023 at 5:00 PM MT

Award

Roads / Highways

$2,957,842.00

Public - City

Paving, Site Work

41

8

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Unit Paving, Irrigation, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
6
Bidding Soon
218
All Active Projects
78
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

April 21, 2023

img_map_placeholder

W Fulton St, Boise, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.