Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Deland, Florida. Completed plans call for the renovation of a educational facility.
(The following sentence applies if the A310 Bid Bond is included for this project) Bids must be accompanied by a bid bond, certified check or cashier's check in an amount equal to five (5) percent of the total bid. Bidders for this project are required to hold a current Certificate of Prequalification issued by the School Board of Volusia County Florida at the time of bid opening. The School Board reserves the right to reject any one or more bids as provided by law. All bids shall be binding for a period of 60 calendar days from the date of bid opening or until School Board approval of the bid, whichever occurs first. The bid amount of the successful bidder, once approved by the School Board, shall not be subject to change or withdrawal. All bids shall be subject to the provisions of the Solicitation, as defined in FAC Document 631, Instructions to Bidders. It is the sole responsibility of all bidders to fully comply with the provisions of the Solicitation during this bidding process. If you have any questions or wish to pre-qualify, contact Facilities Services, 3750 Olson Drive, Daytona Beach Florida 32124; telephone (386) 947-8786. The Building Automation System (BAS) is to provide a peer-to-peer networked, stand-alone, distributed control system for building mechanical and electrical systems. The BAS shall include an operator workstation also known as Engineering Control Center (ECC), field programmable microprocessor based control units panels, instrumentation end control devices, wiring, piping, and related systems to provide centralized and facility wide control functions. B. The BAS shall be designed such that each mechanical and electrical system will be able to operate under stand-alone control. As such, in the event of a network communication failure, or the loss of any other controller, the control system shall continue to independently operate under control. C. The System Integrator (SI) Contractor shall refer to the drawings and equipment specifications for coordination of factory installed control equipment in products furnished by others as they relate to this section. D. Provide all labor (direct employed or subcontracted), materials, programming and supervision necessary to install a complete Building Automation System (BAS) per the construction documents. Include provisions for the following: 1. Mounting hardware for all control devices. 2. Construction supervision. 3. Startup and verify proper operation of control equipment. 4. Point verification and testing of hardware and software. 5. Work in conjunction with the TAB agent to calibrate and adjust devices as required
Award
Educational
$677,500.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 5, 2023
May 5, 2023
800 N Hill Ave, Deland, FL
Related To This Project
Deland, FL
Bid Date: Apr 04 2023
Deland, FL
Bid Date: Mar 30 2023
Deland, FL
Bid Date: Mar 30 2023
Deland, FL
Bid Date: Apr 12 2023
Deland, FL
Bid Date: Mar 21 2023
Deland, FL
Bid Date: Apr 04 2023
DeLand, FL
--
Deland, FL
Bid Date: May 04 2023
Deland, FL
Bid Date: Apr 06 2023
Deland, FL
Bid Date: Apr 05 2023
Deland, FL
Bid Date: Apr 02 2020
Deland, FL
Bid Date: Apr 27 2020
Deland, FL
Bid Date: Mar 16 2023
Deland, FL
Bid Date: Mar 16 2023
Deland, FL
Bid Date: May 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.