BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 23, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a transportation facility in Seattle, Washington. Completed plans call for the renovation of a transportation facility.

The BT014 Project will be responsible for the installation of bus station shelters, furnishings, and systems on top of existing platforms that will be installed by others. The Project has a total of 25 separate station locations along I-405, SR 518, SR 522, and I-5 encompassed by the S1, S2, and S3 Lines. Typically, the locations will have a platform for each direction of travel or will be in a Transit Center. The scope of work also includes the following unique elements including Installation of battery electric bus (BEB) inductive charging stations at five (5) different station locations (Shoreline, Lynnwood, Bothell, Burien, Bellevue). Elements of this include bus charging system, AC charging cabinet, 480V power switchboard, transformer, conduit and wire installation, canopies for the equipment, and security fencing/screening. Additionally, the project scope will include retrofitting various existing stations such as the Bellevue Transit Center, Totem Lake Station, Lynwood Transit center, and various Pedestrian Bridges and Entry Structures. Any questions regarding the RFQ should be directed to Bryan Lammers via email Bryan-Lammers@hoffmancorp.com Construction on the BRT Stations contract is scheduled to begin in Q3 2025. Construction must be substantially complete by Q3 2028. RTA/OA 0206-19

Post-Bid

Transportation Terminals

$70,000,000.00

Public - City

Renovation

484

38

6

3

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
53
Bidding Soon
1,765
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2023

July 1, 2025

Project location map

Multiple Locations, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.