BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in North Attleboro, Massachusetts. Completed plans call for site work for a water / sewer project.

Subtrades: Electrical Work Miscellaneous and Ornamental Iron The work consists of but is not limited to the demolition of existing HVAC, and electrical equipment and systems in the Headworks, and the installation of new HVAC equipment and systems (including unit heaters, exhaust fans, new boiler system, and associated controls), electrical systems (including wiring to support HVAC equipment, and gas detection systems), and structural work to support the HVAC improvements. The work also includes limited replacement of grating in the Headworks. All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond website Question Deadline 03/18/2023 The Work includes the following major items: a. Selective demolition. b. Architectural work 1) Restoration of finishes c. Structural work 1) Infill and penetrations of walls and floors. 2) Indoor equipment pads 3) Replacement of headworks channel grating system 4) Equipment supports and other miscellaneous items d. HVAC Work 1) Exhaust fans to serve the headworks (wet) portion of the building, which is a class 1, division 1 area. 2) Hot water boiler plant, pumps, and accessories 3) Hot water piping distribution system 4) Stainless steel and FRP ductwork 5) Heating terminal equipment 6) Automatic Temperature Controls e. Electrical Work 1) System upgrades to support the new HVAC equipment. 2) Hazardous gas detection systems f. Plumbing Work 1) utility sink 2) domestic water heater 3) gas piping EXISTING SYSTEM DESCRIPTION A. The existing building is a 7,000 square foot building in an operating waste treatment plant the building is split into two portions: The first portion is a single story, 2,500 square foot headworks. The headworks is a Class 1, Division 1 space. The remaining portion is a dual level (on grade and lower level) dry area, consisting of a control room on the upper level, and septage pumps, piping, and chemical storage areas on the lower level. B. The boiler system is a small, oil-fired cast-iron hot-water boiler that only serves unit heaters. There are three gas-fired makeup air units on the roof, all of which have failed and are not operable. C. The goal of this project is to restore proper ventilation to the headworks and provide adequate boiler capacity to provide ventilation to both the headworks and to the dry areas of the building. The ventilation equipment for the dry areas will be installed as part of a planned future project, and is not part of the Work of this project.

Post-Bid

Water / Sewer

$800,000.00

Public - City

Site Work

28

17

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
590
Active Projects
350
Bidding Soon
4,515
All Active Projects
1,907
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 23, 2023

April 24, 2023

February 18, 2024

img_map_placeholder

Cedar Rd, North Attleboro, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.