Renovation of an educational facility in New Smyrna Beach, Florida. Completed plans call for the renovation of a educational facility.
The estimated project cost: $1,200,000. New Smyrna Beach High - Upgrade Building Automation Systems Building 6-8 Energy management system upgrade for Buildings 6-8. Also minor HVAC work. If you have any questions or wish to pre-qualify, contact Facilities Services, 3750 Olson Drive, Daytona Beach Florida 32124; telephone (386) 947-8786 A. The Building Automation System (BAS) is to provide a peer-to-peer networked, stand-alone, distributed control system for building mechanical and electrical systems. The BAS shall include an operator workstation also known as Engineering Control Center (ECC), field programmable microprocessor based control units panels, instrumentation end control devices, wiring, piping, and related systems to provide centralized and facility wide control functions. B. The BAS shall be designed such that each mechanical and electrical system will be able to operate under stand-alone control. As such, in the event of a network communication failure, or the loss of any other controller, the control system shall continue to independently operate under control. C. The System Integrator (SI) Contractor shall refer to the drawings and equipment specifications for coordination of factory installed control equipment in products furnished by others as they relate to this section. D. Provide all labor (direct employed or subcontracted), materials, programming and supervision necessary to install a complete Building Automation System (BAS) per the construction documents. Include provisions for the following: 1. Mounting hardware for all control devices. 2. Construction supervision. 3. Startup and verify proper operation of control equipment. 4. Point verification and testing of hardware and software. 5. Work in conjunction with the TAB agent to calibrate and adjust devices as required. 6. Warrantee. E. The BAS as specified herein shall be provided in its entirety by the SI Contractor. The SI Contractor shall base their bid on the system as specified, the sequence of operation, the point's list (Input/Output Summary) and contract documents. The documentation pertaining to the BAS is schematic in nature. The SI Contractor shall provide equipment and labor not specifically referred to herein or on the plans, that are required to meet the functional intent, shall be provided without additional cost to the owner. F. The SI shall provide all electrical control and interlock wiring connected to the controls and instrumentation systems. G. All 110 VAC or greater voltage power wiring to main control panels shall be provided by Division 16 Contractor (Electrical), and coordinated by this Contractor. Failure of this contractor to coordinate requirements with other divisions shall result in the SI contractor being responsible for any noncoordinated items. H. All 24 VAC control power to operate equipment shall be the responsibility of this contractor. I. All conduits in connection with the controls and instrumentation system shall be furnished and installed by this Contractor. J. The Control Contractor shall install all sensing and control components. K. Provide a comprehensive operator and technician-training program as described herein. L. Provide as-built documentation, software, and all DDC control logic and all associated support documentation on approved media, which accurately represents the final installed system. M. Adjustments of manual balancing devices, as required to obtain design air and/or water flows, shall be by the TAB Contractor. The controls contractor shall provide assistance to the TAB Contractor with control adjustments as required to obtain design flows by: 1. Providing on-site instruction on the proper interfacing and operation of the equipment. 2. Providing the necessary software for use with the balancing contractor's personal computer for interfacing with their control equipment. Where proprietary equipment is required, this equipment shall be provided for the Balancing Contractor's use. 3. Provide 2-hours of onsite for the Balancing Contractor to instruct on proper use of the software and interface with the control system. N. To ensure compatibility and training standards with the present VCSD Building Automation Systems, the BAS must be fully software certified at the time of installation to provide interoperability and backward compatibility to the BAS systems currently installed by the successful BAS manufacturer. The BAS must use only latest versions of database software and tools for area controllers, configuring the system, and for the present graphical user interface (GUI) which is used by the building operator. O. Demolition: The controls contractor shall remove all unused controls, including devices, controllers, conduit, control tubing, and wire. VCSD shall have the right of first refusal for all hardware removed. Demolition shall be complete with exposed surfaces and finishes restored to match the surrounding area. Coordinate work with other trades. 1.4 SCOPE - NEW WEB-BASED CONTROL SYSTEM 1. The System Integrator shall provide a complete BAS for buildings 6, 7, and 8 with all materials and labor needed to control the equipment indicated in the Drawings in the manner indicated in the Sequence of Operations. 2. Include all labor and materials to provide the following: a. Site software. b. Site hardware. c. Control database. d. Graphical interface. e. All control devices shown on the drawings and required to meet the sequence of operations. f. Program control sequences. g. Interconnection to all buildings on campus with equipment or devices to be monitored and/or controlled by the BAS. h. Interconnection with Owner's Central Building Automation and Control System Department at the VCSD Facilities Building via Owner's Ethernet system. i. Provide installation and calibration, supervision, adjustments, and fine tuning necessary for complete and fully operational system.
Award
Educational
$569,981.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 30, 2023
May 29, 2023
1015 10th St, New Smyrna Beach, FL
Related To This Project
New Smyrna Beach, FL
Bid Date: Apr 13 2023
New Smyrna Beach, FL
Bid Date: Apr 27 2023
New Smyrna Beach, FL
Bid Date: Mar 30 2023
New Smyrna Beach, FL
Bid Date: May 02 2023
New Smyrna Beach, FL
Bid Date: May 08 2023
New Smyrna Beach, FL
Bid Date: Jun 08 2023
New Smyrna Beach, FL
--
New Smyrna Beach, FL
Bid Date: Feb 08 2024
New Smyrna Beach, FL
--
New Smyrna Beach, FL
Bid Date: Oct 07 2021
New Smyrna Beach, FL
Bid Date: Feb 06 2023
New Smyrna Beach, FL
--
New Smyrna Beach, FL
Bid Date: Jan 11 2023
New Smyrna Beach, FL
Bid Date: Aug 15 2022
New Smyrna Beach, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.