BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Malone, New York. Completed plans call for the renovation of a educational facility; laboratory facility; swimming pool; and theater / auditorium.

The Owner, the School Board of Malone Central School District, will receive sealed bids to furnish materials and labor to complete the 2021 Capital Project Phase 2 which includes construction of science lab renovations, art classroom renovation, auditorium renovation, pool renovation, masonry repairs, roof membrane replacement, HVAC upgrades and window replacements. Each bid shall be on a stipulated sum basis for the following contracts: Davis Elementary School SED No. 16-15-01-06-0-018-008 Flanders Elementary School SED No. 16-15-01-06-0-017-012 St. Josephs Elementary School SED No. 16-15-01-06-0-011-008 Malone Middle School SED No. 16-15-01-06-0-001-016 Franklin Academy SED No. 16-15-01-06-0-019-021 The 2021 Capital Project (Phase 2) includes science lab renovations, an art classroom renovation, an Auditorium renovation, a pool renovation, masonry repairs, roof membrane replacement, HVAC upgrades, window replacements, site upgrades, various maintenance repairs and a Pre-K Addition. The scope takes place across five building locations. Bidder must provide Bid Security in the amount and form, per the conditions provided in Section Instructions to Bidders. All Bids will remain subject to acceptance for forty-five (45) days following the receipt of Bids. The Owner may, in its sole discretion, release any Bid and return Bid Security prior to that date. Bids shall not include New York State sales and compensating use taxes on materials and supplies incorporated into the Work, as the Owner being exempt therefrom. Bidders must comply with New York Sate Department of Labor Prevailing Wage Rate Schedule and conditions of employment. The School Board of Malone Central School District reserves the right to waive any informalities or irregularities in the Bids received, or to reject all Bids without explanation. SCOPE: The Work consists of the following, but not limited to: 1. Middle/ High School; Alterations and Reconstruction work to these areas: Main Office Suite, Nurse's Suite, Guidance Suite, Science Rooms, LGI 21st Century space and Maker Space/Esports Classroom, Corridors, Stairwells, Art display, and Toilet Rooms. Infrastructure replacement including window and shade replacement, exterior and interior door replacement, heating unit upgrades, flooring replacement, ceiling replacement, LED lighting upgrades and masonry cleaning. MC Range $900K to $1.15M Project # 2020007 Commencement of construction (On-Site Activities): April 3, 2023.

Post-Bid

Educational

$1,150,000.00

Public - City

Renovation

334

43

54

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
493
Active Projects
207
Bidding Soon
2,940
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

April 3, 2023

Project location map

Multiple Locations, Malone, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.