Site work and paving for a road / highway in South Lyon, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

*As of April 17, 2022, project was awarded to DiPonio Contracting for $3,874,858.79. The field operations, laboratory testing, and engineering report preparation were performed under direction and supervision of a licensed professional engineer. Our services were performed according to generally accepted standards and procedures in the practice of geotechnical engineering in this area. Our scope of services for this project is as follows: 1. We performed a total of six (6) pavement core and eight (8) soil borings for the project. The six (6) pavement cores were performed along North Hagadorn Street. We performed soil borings, B-1 through B-6, at the six (6) pavement core locations along North Hagadorn Street. Soil borings B-1 through B-4 were extended to a depth of 15 feet. Soil borings B-5 and B-6 were extended to a depth of 20 feet each. Soil boring B-7 was performed along Chester Court, extending to a depth of 15 feet below grade. Soil boring B-8 was drilled through the pavement of West Crest Lane and extended to a depth of 15 feet. 2. We measured and photographed pavement core samples from the route and performed laboratory testing on representative samples obtained from the soil borings. Laboratory testing included visual engineering classification, grain-size distribution, organic matter content (loss-onignition), moisture content, and unconfined compressive strength determinations. 3. We prepared this engineering report. The report includes recommendations for design pavement sections, paving materials, and construction considerations for underground construction and pavement construction including grade preparation and subgrade stabilization, as necessary. - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Reference Number 0000312432 Description of Work - Approximately 1.57 miles of road reconstruction with storm drainage improvements. Project also includes approximately 4,000 feet of proposed removal and replacement of 8-inch sanitary sewer and 2,300 feet of cured in place (CIP) sanitary sewer improvements. Final Completion with all clean-up and punch-list items shall be complete by November 15, 2023. Question Acceptance Deadline 03/22/2023 04:00 PM EDT

Award

Roads / Highways

$3,874,859.00

Public - City

Paving, Site Work

92

11

10

3

Subscribe For Documents

95 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
355
Active Projects
196
Bidding Soon
2,583
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

May 29, 2023

Project location map

Multiple Locations, South Lyon, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.