BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a pipeline in Pensacola, Florida. Completed plans call for site work for a pipeline.

The scope of work may include, but is not limited to, the following: Steel Main Install - Will include trenching, final clean-up, restoration, and provide a completed pipeline system ready for gas distribution as herein specified and according to the attached PE facility map/drawing and specifications. Main shall be made live as soon as practical. Steel to Steel Main Tie-in - Will include testing main, pigging line, installation of the necessary squeeze-off or steel appurtenances for gas control, as well as tapping through steel, and purging. Also includes final clean-up and restoration. All steel connections shall be welded connections (with no mechanical fittings). Abandon Steel Main - Will include installation of the necessary fittings, squeeze-off or steel appurtenances for gas control, as well as tapping through steel, purging abandoned facilities, and capping lines, per PE standards, and final clean-up and restoration. This Item is only paid when retiring existing pressurized gas system per project design. Dewatering pit/main line - Will include all equipment, labor, and provisions necessary to dewater when required for completion of work. All dewatering must adhere to requirements of Section 1.38 Environmental Hazards. Any questions concerning the proposal should be addressed and submitted in writing no later than May 17, 2023, at 10:00 A.M to: Dedria Lunderman, Assistant Purchasing Manager City of Pensacola 222 W. Main St. Pensacola, FL 32502 purchasing@cityofpensacola.com This project will involve installation of a new U.S. made seamless 6" steel gas main with an operating pressure of 200psi to replace an existing steel main infrastructure at Regulator Station 2 located at 4001 Lillian Hwy. All existing underground piping will be abandoned in place as shown on the Facility Abandonment Map. The incoming 12" steel gas main will have a 12" spherical tee welded to it and the 6" main before the header will have a 6" spherical tee welded to it. Once both spherical tees are in place and the new 6" pipe is in place, the 12" existing line and the 6" existing line will be stoppered and end caps will be installed. At this point the new 6" pipe will be made live. Once this part of the project is complete, the abandonment of the existing steel infrastructure will be completed. All pipelines abandoned must be purged and the ends capped. All work areas will be free of any coating prior to the start of the project. Coating removal will be performed by Pensacola Energy. A load of clean backfill will be provided by Pensacola Energy for the initial backfill. The remaining backfill will be completed by using the existing soil that was removed during the project. Please reference the attached maps for information regarding the existing facilities, proposed facilities, and abandonment of facilities.

Bid Results

Pipeline

$226,975.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
62
Bidding Soon
925
All Active Projects
411
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 24, 2023

June 23, 2023

img_map_placeholder

4001 Lillian Hwy, Pensacola, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.