Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 30, 2023 at 8:00 PM
Updated January 29, 2024
Renovation of a clubhouse / community center in Chapel Hill, Tennessee. Completed plans call for the renovation of a clubhouse / community center.
Total cost is estimated to exceed $100,000.00. d Conference Center - 105-foot by 42-foot building with 6 window sections and 3 storefront door sections a) After removing existing siding, provide and install the following new items: i) Closed cell spray foam insulation in exterior walls (R-15) ii) ZIP-system (1-inch) sheathing per manufacturer's instructions iii) Non-operable insulated, double pane, argon filled, Low-E storefront-style windows iv) Insulated, double pane, argon filled, Low-E storefront doors v) Hardie Board and Batten siding and Hardie vented soffit b) Provide and install new 6-inch gutters with gutter guards and 5-Inch downspouts. c) Prep, caulk, and paint two coats on all siding, fascia, and trim. Description of Demolition or Associated Work Demolition - properly dispose of off- property unless otherwise noted 1) Remove all siding, windows, fascia, and soffits on all indicated buildings New Work 1) Provide and install closed cell spray foam insulation to R-15 in exterior walls. 2) Provide and install new zip systems sheathing, Hardie board and batten siding, and matching trim on all four sides of buildings. 3) Provide and install new replacement exterior dark sky LED lighting fixtures. 4) Provide and install new non-operable argon filled, Low-E storefront-style windows and storefront door units. 5) Provide and Install new Hardie pre-vented soffit, fascia, and 6-inch gutters with guards with 5-inch downspouts. Page 3 of 8 6) Prep, caulk, and paint all fiber cement areas, soffits, and steel doors with two coats. Question Deadline 03/10/2023
Post-Bid
Clubhouse / Community Centers
$100,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2023
April 20, 2023
4209 Nashville Hwy, Chapel Hill, TN
Related To This Project
Chapel Hill, TN
Bid Date: May 08 2023
Chapel Hill, TN
Bid Date: Jun 09 2023
Chapel Hill, TN
Bid Date: Oct 12 2023
Chapel Hill, TN
Bid Date: Dec 21 2023
Chapel Hill, TN
Bid Date: Feb 06 2024
Chapel Hill, TN
Bid Date: Apr 19 2024
Chapel Hill, TN
Bid Date: Apr 16 2024
Chapel Hill, TN
Bid Date: Jul 02 2025
Chapel Hill, TN
Bid Date: Feb 20 2020
Chapel Hill, TN
Bid Date: Dec 06 2022
Chattanooga, TN
Bid Date: Mar 22 2023
Livingston, TN
Bid Date: Mar 17 2023
Brownsville, TN
Bid Date: Mar 16 2023
Dunlap, TN
Bid Date: Mar 27 2023
Nashville, TN
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
