BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 19, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a playground / park / athletic field in Charlevoix, Michigan. Working plans call for the renovation of a playground / park / athletic field.

Also included is a crushed stone ADA accessible pathway at the southwest end of the trail that connects to an accessible overlook. This work includes, but is not limited to, the Removal and relocation of site features required to construct new path. PROJECT -This Project consists primarily of the construction of a 6' wide asphalt path along the length of the upland dune side of Lake Michigan Beach Park, parallel to Park Avenue. Also included is a crushed stone ADA accessible pathway at the southwest end of the trail that connects to an accessible overlook. This work includes, but is not limited to, the following: Removal and relocation of site features required to construct new path. Construction of approximately 2000 linear feet of asphalt path, with one ADA ramp and two new crosswalks to connect to existing trail system. Construction of approximately 220 linear feet of crushed stone path. Construction of timber overlook structure with helical piles, surface-mount bench and interpretive sign. Selective understory clearing is also included to improve views from the overlook. Bioswale planting to handle stormwater runoff along one section of trail. Removal of brick pillars and installation of rail at top of existing stairs. Concrete block retaining wall where trail is directly adjacent to existing trees. Lawn restoration at trail shoulders. Alternate ADA pathway connection: the project bid is also to include the approximately 400' length ADA pathway connection from the corner of Park and Grant, down the slope to the beach restrooms. This work, which includes a 6' wide concrete path with ramps and rails as needed to meet accessibility guidelines, will be included as an alternate pending available funding. Questions due Tuesday, 3/14/2023 at 5 PM EST All correspondence, questions and additional information regarding this RFP shall be submitted, via e-mail, by deadline listed above, to: Suzanne Fromson, Project Manager, Edgewater Resources, LLC sfromson@edgewaterresources.com

Final Planning

Playgrounds / Parks / Athletic Fields

$100,000.00

Public - City

Renovation

21

15

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
20
Bidding Soon
193
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

April 24, 2023

Project location map

To Be Determined, Charlevoix, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.