BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Pottstown, Pennsylvania. Completed plans call for the renovation of a educational facility; and water / sewer project.

The Pottstown School District is soliciting bids for the replacement of the High Schools Domestic Hot Water System within the Mechanical Room (excluding the 2022 Emergency Repairs which included (2) new 380-gallon storage tanks, misc. piping, and valves). All requests for clarifications and substitutions must be in writing and sent by email to Eric Riegler, by email at eriegler@oandsassociates.com, no later than 4 p.m. on March 24, 2023. Project Mobilization: After last day of school for students - Mid June 2023 Final Completion and Demobilization: Before start of new school year - Mid August 2023. Work under this contract includes, but is not limited to the following: 1. Demolition and Removal of existing 3,000 MBH Cleaver-Brooks Watertube Boiler and associated leaking Shell & Tube Heat Exchanger used for domestic hot water generation including all associated equipment and piping connections to point indicated on drawings. a. This shall include the demolition and removal of domestic boiler's exhaust ductwork, gas piping, electrical power connections, and controls. 2. Removal and replacement of the building's inline domestic hot water return (DHWR) circulation pump. 3. Removal of dead end piping legs and installation of new pipe fittings as indicated on the drawings. 4. Installation of two (2) 1,250 MBH Volume Water Heaters and associated new piping/valve connections up to point of 2022 Emergency Repairs* as indicated on the drawings. a. This shall include all associated work for a complete and operational system including new combustion air and exhaust, gas piping, electrical power wiring, and interconnection with the existing Building Automation System (BAS). b. *NOTE: The 2022 Emergency Repairs included (2) new 380-gallon Storage Tanks, misc. piping, and valves up to the existing Shell & Tube Heat Exchanger. Proposed scope of work under this contract shall interconnect with the 2022 Emergency Repairs and utilize the (2) existing 380-gallon Storage Tanks for domestic hot water storage. 5. Provide factory startup and testing.

Award

Water / Sewer

$174,650.00

Public - City

Renovation

13

12

2

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
130
Bidding Soon
2,588
All Active Projects
1,203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2023

June 15, 2023

img_map_placeholder

750 N Washington St, Pottstown, PA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.