BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 18, 2024 at 8:00 PM

Updated October 19, 2024

Site work and paving for a road / highway in East Moline, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of October 18, 2024, per owner, at this time the project is not moving forward. Floreciente District Trail Connection - conceptual and specifications for side paths along 46th Street and 1st Avenue that will/may eventually connect to the Moline (Sylvan Island)/Rock Island District Trail. The consultant will develop engineered flatwork conceptual design and specifications for paths/crossings located on the right-of-way. All inquiries related to this Request for Proposals should be directed to: K.J. Whitley Community Development Manager Community & Economic Development Department City of Moline 619 16th Street Moline, IL 61265 Email: kwhitley@moline.il.us Phone: (309) 524.2044 The City of Moline reserves the right to waive any irregularities in the proposals and to reject any and all qualification packets and the right, in its sole discretion, to accept the qualification it considers most favorable to the interests of the City of Moline.

Project Abandoned

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
98
Bidding Soon
1,305
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2023

October 19, 2024

Project location map

135 4th Ave, East Moline, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.