Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Wichita, Kansas. Contact the soliciting agency for additional information.
Provide labor, materials and equipment for the following types of services upon request of various county facilities: • Repair existing electrical components. • Change/move existing electrical components. • Create new electrical components. Services provided must meet the following requirements: • Respond to normal service requests within one (1) business day. A response is defined as a scheduled service call confirmed with requesting county employee. • Respond to urgent service requests within four (4) hours during a normal business day. A business day is defined Monday-Friday, 8:00 am – 5:00 pm. An urgent request is defined by the county as “risk of property damage or long term health risk”. • Respond to emergency service requests within one (1) hour, including evenings/weekends/holidays (after hours). An emergency is defined by the county as any condition(s) which is a threat to health, welfare or the safety of people and/or property or a condition that will affect an essential service(s) as determined by the County Project Manager or his authorized representative(s), and also applies in the event of a natural disaster or other catastrophic event when the County Administrator has declared a “State of Emergency”. Contractor shall provide the county with a twenty-four (24) hour emergency contact phone number. • All work areas will be left in a safe, and workable condition. It will be the responsibility of the contractor to leave the area in a clean, “broom swept” state. Contractor must remove all debris generated while making repairs, replacements, or installations. • Contractor shall ONLY repair, replace, upgrade or install work that is instructed. • If there are any questions regarding the work that is to be done, it will be the responsibility of the contractor to contact the designated county representative and request clarifications before proceeding. • It will be required that the contractor diagnose the problem, provide a material and labor quote to requesting/authorized county representative and make the necessary repairs as soon as possible upon county approval and receipt of valid PO and any required project exemption forms. Work totaling more than $500.00 will require Project Exemption forms to be completed and issued by the Purchasing department. Those forms must be issued prior to the start of the job. • Contractor shall be aware they will be performing work in occupied public offices that must stay open per State Laws. • In the event of accidental site damage, it will be the responsibility of the contractor to return the site to its original condition at no cost to the county. • If temporary repairs are needed due to an emergency, the contractor is instructed to do so at the direction of the county’s designated representative. • All permanent repairs must be made as soon as possible. This must be done within fourteen (14) days after the problem has been diagnosed and approval to proceed has been given. • Contractor is an independent contractor. The manner in which the services are performed shall be controlled by the contractor; however, the nature of the services and the results to be achieved shall be specified by the county. The contractor is not to be deemed an employee or agent of the county and has no authority to make any binding commitments or obligations on behalf of the county except as expressly provided herein. Any questions regarding this document must be submitted in writing to Lee Barrier at Lee.Barrier@sedgwick.gov by 5:00pm CDT, March 28, 2023.
Post-Bid
Municipal
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2023
May 18, 2023
Multiple Locations, Wichita, KS
Related To This Project
Water Distribution System for Storm Water Drain Cedar Downs Circle and Cedar Dale Addition - 5009721
Wichita, KS
Bid Date: Mar 24 2023
Wichita, KS
Bid Date: Mar 18 2023
Wichita, KS
Bid Date: Mar 24 2023
Wichita, KS
Bid Date: Mar 31 2023
Wichita, KS
Bid Date: Apr 11 2023
Wichita, KS
--
Wichita, KS
Bid Date: Mar 29 2023
Wichita, KS
Bid Date: Mar 31 2023
Wichita, KS
Bid Date: Mar 24 2023
Wichita, KS
Bid Date: Mar 22 2023
Wichita, KS
Bid Date: Mar 31 2023
Wichita, KS
Bid Date: Mar 24 2023
Wichita, KS
Bid Date: Apr 11 2023
Wichita, KS
Bid Date: Mar 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.