Published April 26, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a clubhouse / community center in Sturtevant, Wisconsin. Completed plans call for the renovation of a clubhouse / community center.

In general the work consists of: upgrades to AHU-3, replacing the fan motor and VFD for AHU-3 and RF-3, replacing the cooling coil in AHU-3, replacing the condensing unit for AHU-3. Work also includes rewiring of controls to the new equipment. All potential bidders must become certified by DOA prior to submitting bids on state construction projects 11 with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes 12 take effect January 1, 2014. The bidder is responsible for the sealed bid being delivered to the indicated location or email before the time 27 specified for the bid submission. Third party delivery is entirely at the bidder's risk. In general the work consists of: upgrades to AHU-3, replacing the fan motor and VFD for AHU-3 and RF-3, 34 replacing the cooling coil in AHU-3, replacing the condensing unit for AHU-3. Work also includes rewiring of 35 controls to the new equipment. Please submit forms and contact: 15 Jeffrey Ricchoi 16 (262) 844-2410 X5033 17 jeffreya.ricchio@wisconsin.gov 18 for additional information. 19 20 Bidding Documents will be available online immediately upon the project being advertised for bid. Contact the Supplier Diversity Program with questions - DiverseSpend@wi.gov, or visit their website

Award

Clubhouse / Community Centers

$143,700.00

Public - State/Provincial

Renovation

7

15

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Project Record Documents, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Ventilation Hoods, Fume Hoods, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
96
Bidding Soon
2,065
All Active Projects
769
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2023

May 4, 2023

img_map_placeholder

9351 Rayne Rd, Sturtevant, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.